Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Mahwa, Rajasthan.

Mahwa at a glance for solar projects

District and stateDausa district, Rajasthan
Electricity supplyJaipur Vidyut Vitran Nigam Limited (JVVNL) supplies electricity in Dausa district, one of the districts it lists as its area.
Electricity regulatorRajasthan Electricity Regulatory Commission (RERC)
State renewable energy agencyRajasthan Renewable Energy Corporation Limited (RREC)
State solar policyRajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,420 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 190 km from Mahwa in a straight line

Solar services in Mahwa

Mahwa: industrial areas

RIICO, the Rajasthan State Industrial Development and Investment Corporation, lists Mahuwa among its industrial areas in Dausa district.

The Government of India's One District One Product (ODOP) list names Stone Products as the product of Dausa district.

Solar output in Mahwa

A solar plant in Mahwa is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.50 per unit
100 kW1.4 lakh units1,000 sq m₹9.2 lakh
500 kW7.1 lakh units5,000 sq m₹46.1 lakh
1 MW14.2 lakh units10,000 sq m₹92.3 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Mahwa

For a rooftop array in Mahwa the strongest month is May, at about 145 units for each kW installed, and the weakest is August, at about 95. For a ground-mounted array at a 31° tilt the strongest month is March (about 148) and the weakest is July (about 90). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January112140
February116135
March140148
April144140
May145132
June123109
July9990
August9590
September106109
October123138
November109133
December108138

Somaya Solar projects near Mahwa

These are the Somaya Solar projects closest to Mahwa, with straight-line distances. They are shown as references and are not in Mahwa unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 260 km from Mahwa. In progress. Site access was difficult and was handled with local support.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 310 km from Mahwa. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 310 km from Mahwa. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Mahwa

Which electricity company handles solar connections in Mahwa?

Jaipur Vidyut Vitran Nigam Limited (JVVNL) supplies electricity in Dausa district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Mahwa?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.

How much electricity does a solar plant generate in Mahwa?

About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Mahwa?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 190 km from Mahwa in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 260 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Mahwa

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image