Turnkey Solar EPC Solutions in Mira and Bhayander

Somaya Solar Solutions Limited delivers turnkey solar projects in Mira and Bhayander, Maharashtra: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Mira and Bhayander

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (AEML) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Mira and Bhayander

In Maharashtra, consumers of every category, including commercial and industrial, can install a rooftop or on-premises renewable system under net metering, net billing or gross metering. Under net metering the system may be up to 5 MW or the consumer's contract demand or sanctioned load, whichever is lower. Under the other arrangements it may be up to the contract demand or sanctioned load. The rules are in MERC's Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019, as amended in November 2023 and August 2024.

The size limits, charges and other conditions for Maharashtra are on the page Turnkey Solar EPC in Maharashtra.

In Mira-Bhayander the application for connection and metering goes to AEML.

What to expect from the plant in Mira and Bhayander

A solar plant in Mira and Bhayander is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the MSEDCL HT I (A): HT - Industry energy charge of ₹8.44 per kVAh (MERC order of 25 March 2026 in Case No. 75 of 2025 (review of MSEDCL's MYT order of 28 March 2025), rates for 2026-27 in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is MSEDCL's energy charge for 2026-27. HT consumers (11 kV to 33 kV) also pay a wheeling charge of ₹0.81 per kVAh, for a total of ₹9.25. EHV consumers (66 kV and above) pay no wheeling charge. A demand charge of ₹650 per kVA per month also applies. Time of day: energy used from 9 AM to 5 PM gets a rebate of 15% of the energy charge from April to September and 25% from October to March. Energy used from 5 PM to midnight costs 20% more. The tariffs exclude electricity duty and taxes. Mumbai licensees have their own MERC orders of 28 March 2025 with lower 2026-27 rates for HT I industry, each with a demand charge of ₹400 per kVA per month: AEML ₹5.73 per kVAh plus ₹0.57 wheeling, Tata Power-D ₹5.67 plus ₹0.69, and BEST ₹5.47 plus ₹0.88.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.44 per kVAh
100 kW1.4 lakh units1,000 sq m₹11.5 lakh
500 kW6.8 lakh units5,000 sq m₹57.4 lakh
1 MW13.6 lakh units10,000 sq m₹1.15 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Mira and Bhayander

These are the Somaya Solar projects closest to Mira and Bhayander, with straight-line distances. They are shown as references and are not in Mira and Bhayander unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 930 km from Mira and Bhayander. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1190 km from Mira and Bhayander. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1210 km from Mira and Bhayander. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Mira and Bhayander

Which electricity company handles solar connections in Mira and Bhayander?

Adani Electricity Mumbai Limited (AEML) holds the distribution licence for Mumbai's suburbs and the Mira-Bhayander Municipal Corporation area.

Is net metering available for factories and commercial buildings in Mira and Bhayander?

Net metering up to 5 MW or the contract demand, whichever is lower; net billing and gross metering also allowed. The rule is the same across Maharashtra.

How much electricity does a solar plant generate in Mira and Bhayander?

About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Mira and Bhayander?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1140 km from Mira and Bhayander in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 930 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Mira and Bhayander

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.