Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Mokokchung, Nagaland. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Local points for solar projects in Mokokchung
The Government of India's One District One Product (ODOP) list names Coffee, Tea, Banana and Ginger as the products of Mokokchung district.
Metering rules for business rooftops in Mokokchung
In Nagaland, grid-connected rooftop solar for all consumers falls under the NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019. NERC amended them on 20 May 2024 and again on 29 March 2025.
The size limits, charges and other conditions for Nagaland are on the page Commercial & Industrial Solar in Nagaland.
In Mokokchung the application for connection and metering goes to DoPN.
Output and bill value for a rooftop plant in Mokokchung
A solar plant in Mokokchung is modelled to produce about 1,160 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial (Category B), more than 5,000 kWh a month energy charge of ₹8.25 per kWh (NERC tariff order dated 17 September 2026, in force from 1 October 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Industrial category is charged in slabs: ₹7.15 up to 500 kWh, ₹7.91 for 501 to 5,000 kWh and ₹8.25 above 5,000 kWh. The schedule shows no separate HT rate. A monthly minimum charge of ₹250 per kVA of contract demand applies. These are the subsidised rates; if the state government's subsidy is not paid in time, DoPN may bill the full cost tariff of ₹10.53 per kWh. Bulk supply is ₹7.75 per kWh. Time-of-day rates for commercial and industrial users: 20% above the normal rate from 6 to 8 AM and 4 to 9 PM, 20% below from 8 AM to 4 PM, and normal from 9 PM to 6 AM. The order approves it provisionally and it needs smart meters. The schedule heading also mentions 1 April 2026, while the rate column covers 1 October 2026 to 31 March 2027.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.25 per kWh |
|---|---|---|---|
| 100 kW | 1.2 lakh units | 1,000 sq m | ₹9.6 lakh |
| 250 kW | 2.9 lakh units | 2,500 sq m | ₹23.9 lakh |
| 500 kW | 5.8 lakh units | 5,000 sq m | ₹47.9 lakh |
| 1 MW | 11.6 lakh units | 10,000 sq m | ₹95.7 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Mokokchung
These are the Somaya Solar projects closest to Mokokchung, with straight-line distances. They are shown as references and are not in Mokokchung unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1460 km from Mokokchung. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1560 km from Mokokchung. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1650 km from Mokokchung. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Mokokchung
Which electricity company handles solar connections in Mokokchung?
Department of Power, Government of Nagaland (DoPN) is the distribution utility for Nagaland and supplies Mokokchung district.
Is net metering available for factories and commercial buildings in Mokokchung?
Net or gross metering, 1 kWp to 500 kWp, up to 100% of sanctioned load. The rule is the same across Nagaland.
How much electricity does a solar plant generate in Mokokchung?
About 1,160 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Mokokchung?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1700 km from Mokokchung in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1460 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Mokokchung
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019, with the First Amendment of 20 May 2024 and the Second Amendment of 29 March 2025
- NERC tariff order dated 17 September 2026 (Table 8.3 and Appendix II, approved tariff schedule)
- NERC tariff order dated 17 September 2026, introduction item (d)
- PVGIS, European Commission Joint Research Centre (solar output model)