Somaya Solar Solutions Limited delivers turnkey solar projects in Mokokchung, Nagaland: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Mokokchung

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (DoPN) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Mokokchung

In Nagaland, grid-connected rooftop solar for all consumers falls under the NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019. NERC amended them on 20 May 2024 and again on 29 March 2025.

The size limits, charges and other conditions for Nagaland are on the page Turnkey Solar EPC in Nagaland.

In Mokokchung the application for connection and metering goes to DoPN.

What to expect from the plant in Mokokchung

A solar plant in Mokokchung is modelled to produce about 1,160 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial (Category B), more than 5,000 kWh a month energy charge of ₹8.25 per kWh (NERC tariff order dated 17 September 2026, in force from 1 October 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Industrial category is charged in slabs: ₹7.15 up to 500 kWh, ₹7.91 for 501 to 5,000 kWh and ₹8.25 above 5,000 kWh. The schedule shows no separate HT rate. A monthly minimum charge of ₹250 per kVA of contract demand applies. These are the subsidised rates; if the state government's subsidy is not paid in time, DoPN may bill the full cost tariff of ₹10.53 per kWh. Bulk supply is ₹7.75 per kWh. Time-of-day rates for commercial and industrial users: 20% above the normal rate from 6 to 8 AM and 4 to 9 PM, 20% below from 8 AM to 4 PM, and normal from 9 PM to 6 AM. The order approves it provisionally and it needs smart meters. The schedule heading also mentions 1 April 2026, while the rate column covers 1 October 2026 to 31 March 2027.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.25 per kWh
100 kW1.2 lakh units1,000 sq m₹9.6 lakh
500 kW5.8 lakh units5,000 sq m₹47.9 lakh
1 MW11.6 lakh units10,000 sq m₹95.7 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Mokokchung

These are the Somaya Solar projects closest to Mokokchung, with straight-line distances. They are shown as references and are not in Mokokchung unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1450 km from Mokokchung. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1460 km from Mokokchung. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1560 km from Mokokchung. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Mokokchung

Which electricity company handles solar connections in Mokokchung?

Department of Power, Government of Nagaland (DoPN) is the distribution utility for Nagaland and supplies Mokokchung district.

Is net metering available for factories and commercial buildings in Mokokchung?

Net or gross metering, 1 kWp to 500 kWp, up to 100% of sanctioned load. The rule is the same across Nagaland.

How much electricity does a solar plant generate in Mokokchung?

About 1,160 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Mokokchung?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1700 km from Mokokchung in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1450 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Mokokchung

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image