Somaya Solar Solutions Limited delivers turnkey solar projects in Dergaon, Assam: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Dergaon
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (APDCL) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Dergaon
In Assam, rooftop solar is governed by the AERC (Grid Interactive Solar PV Systems) Regulations, 2019, notified on 6 August 2019 and amended on 18 June 2024. APDCL has asked the regulator to cut net metering benefits and stop paying for surplus energy. AERC has not changed the rules. On 5 August 2026 it told APDCL to keep processing applications under the existing rules while the petition is pending.
The size limits, charges and other conditions for Assam are on the page Turnkey Solar EPC in Assam.
In Dergaon the application for connection and metering goes to APDCL.
What to expect from the plant in Dergaon
A solar plant in Dergaon is modelled to produce about 1,150 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industries-II, above 150 kVA (Option 1) energy charge of ₹8.09 per kWh (AERC tariff order of 6 March 2026 (Petition No. 20 of 2025), in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Option 1 has a fixed charge of ₹280 per kVA per month. Option 2 has ₹360 per kVA per month and ₹7.69 per kWh. Time-of-day applies: 80% of the energy charge from 9 AM to 5 PM and 120% from 5 PM to 10 PM. Billing demand is the higher of the contract demand and the recorded demand. HT Industries-I (50 to 150 kVA) pays ₹7.69 per kWh and ₹200 per kVA per month. The schedule applies to all categories of APDCL consumers.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.09 per kWh |
|---|---|---|---|
| 100 kW | 1.1 lakh units | 1,000 sq m | ₹9.3 lakh |
| 500 kW | 5.8 lakh units | 5,000 sq m | ₹46.5 lakh |
| 1 MW | 11.5 lakh units | 10,000 sq m | ₹93.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Dergaon
These are the Somaya Solar projects closest to Dergaon, with straight-line distances. They are shown as references and are not in Dergaon unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1390 km from Dergaon. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1400 km from Dergaon. Completed, including the transmission line work coordinated with the local distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1500 km from Dergaon. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Dergaon
Which electricity company handles solar connections in Dergaon?
Assam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Golaghat district.
Is net metering available for factories and commercial buildings in Dergaon?
Rooftop solar from 1 kWp to 1,000 kWp, up to 100% of connected load or contract demand. The rule is the same across Assam.
How much electricity does a solar plant generate in Dergaon?
About 1,150 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.5 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Dergaon?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1640 km from Dergaon in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1390 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Dergaon
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- AERC order sheet of 5 August 2026, Petition No. 09/2026, which reproduces the AERC (Grid Interactive Solar PV Systems) Regulations, 2019 and the First Amendment of 18 June 2024; Assam Integrated Clean Energy Policy, 2025, clause 6.1
- APDCL notice of tariff schedule w.e.f. 1 April 2026 (AERC order of 6 March 2026); AERC press release of 6 March 2026
- Assam Integrated Clean Energy Policy, 2025, definitions
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)