Somaya Solar Solutions Limited delivers turnkey solar projects in Nagaland: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Nagaland
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Nagaland
In Nagaland, grid-connected rooftop solar for all consumers falls under the NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019. NERC amended them on 20 May 2024 and again on 29 March 2025.
- An eligible consumer may install a system under net metering or gross metering. Under net metering the consumer uses the power at the premises and injects the surplus. Under gross metering all the power is sold to the distribution licensee.
- The system may not exceed 100% of the connected load, sanctioned load or contract demand. It must be at least 1 kWp and at most 500 kWp.
- The total rooftop capacity fed from one distribution transformer may not exceed 100% of that transformer's capacity.
- Credits left unused at the end of the settlement period are treated as units bought by the distribution licensee at a rate that the Department of Power proposes and the Commission approves (Second Amendment, 29 March 2025). The 2019 text had treated them as inadvertent injection that was not paid for. No approved rate for 2026-27 was found.
- The consumer still pays the monthly minimum charge, whatever the credit balance. Rooftop systems are exempt from wheeling, cross-subsidy, transmission and distribution and banking charges.
- Group net metering is provided for, and a third party that leases rooftops may install a system. The regulations do not stop the State from setting up systems above 500 kW through another route.
- The First Amendment of 20 May 2024 requires the technical feasibility study within 15 days, failing which the proposal is presumed feasible. Applications up to 10 kW are deemed accepted without a study.
What to expect from the plant in Nagaland
Solar output changes across Nagaland with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,080 to 1,260 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Chumukedima | 1,210 | 1,280 |
| Dimapur | 1,210 | 1,280 |
| Kohima | 1,260 | 1,330 |
| Longleng | 1,150 | 1,210 |
| Mokokchung | 1,160 | 1,220 |
| Mon | 1,080 | 1,140 |
| Tuensang | 1,140 | 1,190 |
| Wokha | 1,180 | 1,230 |
| Zunheboto | 1,180 | 1,250 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Nagaland
Is net metering available for factories and commercial buildings in Nagaland?
In Nagaland, grid-connected rooftop solar for all consumers falls under the NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019. NERC amended them on 20 May 2024 and again on 29 March 2025.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Nagaland
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.