Somaya Solar Solutions Limited builds ground-mounted solar power plants in Nagaland for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Nagaland
Solar output changes across Nagaland with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,140 to 1,330 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Chumukedima | 1,210 | 1,280 |
| Dimapur | 1,210 | 1,280 |
| Kohima | 1,260 | 1,330 |
| Longleng | 1,150 | 1,210 |
| Mokokchung | 1,160 | 1,220 |
| Mon | 1,080 | 1,140 |
| Tuensang | 1,140 | 1,190 |
| Wokha | 1,180 | 1,230 |
| Zunheboto | 1,180 | 1,250 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Nagaland
Under NERC's Open Access Regulations, 2012, open access is permitted to consumers seeking it for a capacity of 1 MW and above. NERC's Green Energy Open Access charges regulations of 30 September 2024 cover consumers with a contracted demand or sanctioned load of 100 kW or more, except captive users.
- Banked green energy carries a banking charge of 8% of the energy banked, adjusted in kind.
- The cross-subsidy surcharge for green energy open access may not exceed 20% of the tariff or average billing rate of the consumer category. It is not levied on a captive generating plant supplying its own user.
- Wheeling charge for 1 October 2026 to 31 March 2027: ₹3.86 per kWh. NERC did not split it by voltage.
- No cross-subsidy surcharge or additional surcharge figure for 2026-27 was found in the tariff order.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Nagaland
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Nagaland
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.