Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Mon, Nagaland.

Mon at a glance for solar projects

District and stateMon district, Nagaland
Electricity supplyDepartment of Power, Government of Nagaland (DoPN) is the distribution utility for Nagaland and supplies Mon district.
Electricity regulatorNagaland Electricity Regulatory Commission (NERC)
State renewable energy agencyDepartment of Power, Nagaland (DoPN)
Rooftop metering for businessesNet or gross metering, 1 kWp to 500 kWp, up to 100% of sanctioned load
Modelled solar outputabout 1,080 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1740 km from Mon in a straight line

Solar services in Mon

Local points for solar projects in Mon

The Government of India's One District One Product (ODOP) list names Large Cardamom, Tea, Bamboo and Handicraft as the products of Mon district.

Solar output in Mon

A solar plant in Mon is modelled to produce about 1,080 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial (Category B), more than 5,000 kWh a month energy charge of ₹8.25 per kWh (NERC tariff order dated 17 September 2026, in force from 1 October 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Industrial category is charged in slabs: ₹7.15 up to 500 kWh, ₹7.91 for 501 to 5,000 kWh and ₹8.25 above 5,000 kWh. The schedule shows no separate HT rate. A monthly minimum charge of ₹250 per kVA of contract demand applies. These are the subsidised rates; if the state government's subsidy is not paid in time, DoPN may bill the full cost tariff of ₹10.53 per kWh. Bulk supply is ₹7.75 per kWh. Time-of-day rates for commercial and industrial users: 20% above the normal rate from 6 to 8 AM and 4 to 9 PM, 20% below from 8 AM to 4 PM, and normal from 9 PM to 6 AM. The order approves it provisionally and it needs smart meters. The schedule heading also mentions 1 April 2026, while the rate column covers 1 October 2026 to 31 March 2027.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.25 per kWh
100 kW1.1 lakh units1,000 sq m₹8.9 lakh
500 kW5.4 lakh units5,000 sq m₹44.5 lakh
1 MW10.8 lakh units10,000 sq m₹89.1 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Mon

For a rooftop array in Mon the strongest month is March, at about 113 units for each kW installed, and the weakest is July, at about 75. For a ground-mounted array at a 31° tilt the strongest month is March (about 119) and the weakest is July (about 69). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January91111
February89101
March113119
April107105
May10597
June8174
July7569
August8379
September8384
October9098
November84101
December85105

Somaya Solar projects near Mon

These are the Somaya Solar projects closest to Mon, with straight-line distances. They are shown as references and are not in Mon unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1500 km from Mon. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1510 km from Mon. Completed, including the transmission line work coordinated with the local distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1600 km from Mon. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Mon

Which electricity company handles solar connections in Mon?

Department of Power, Government of Nagaland (DoPN) is the distribution utility for Nagaland and supplies Mon district.

Is net metering available for factories and commercial buildings in Mon?

Net or gross metering, 1 kWp to 500 kWp, up to 100% of sanctioned load. The rule is the same across Nagaland.

How much electricity does a solar plant generate in Mon?

About 1,080 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 10.8 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Mon?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1740 km from Mon in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1500 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Mon

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image