Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Nagaland as an EPC contractor: engineering, supply, construction and commissioning.
What Nagaland's policy says about large solar plants
Under NERC's Open Access Regulations, 2012, open access is permitted to consumers seeking it for a capacity of 1 MW and above. NERC's Green Energy Open Access charges regulations of 30 September 2024 cover consumers with a contracted demand or sanctioned load of 100 kW or more, except captive users.
- Banked green energy carries a banking charge of 8% of the energy banked, adjusted in kind.
- The cross-subsidy surcharge for green energy open access may not exceed 20% of the tariff or average billing rate of the consumer category. It is not levied on a captive generating plant supplying its own user.
- Wheeling charge for 1 October 2026 to 31 March 2027: ₹3.86 per kWh. NERC did not split it by voltage.
- No cross-subsidy surcharge or additional surcharge figure for 2026-27 was found in the tariff order.
Output and land at megawatt scale in Nagaland
Solar output changes across Nagaland with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,140 to 1,330 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Chumukedima | 1,210 | 1,280 |
| Dimapur | 1,210 | 1,280 |
| Kohima | 1,260 | 1,330 |
| Longleng | 1,150 | 1,210 |
| Mokokchung | 1,160 | 1,220 |
| Mon | 1,080 | 1,140 |
| Tuensang | 1,140 | 1,190 |
| Wokha | 1,180 | 1,230 |
| Zunheboto | 1,180 | 1,250 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Questions about solar projects in Nagaland
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Nagaland
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.