Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Munger, Bihar.

Munger at a glance for solar projects

District and stateMunger district, Bihar
Electricity supplySouth Bihar Power Distribution Company Limited (SBPDCL) supplies electricity in Munger district, one of the districts it lists as its area.
Electricity regulatorBihar Electricity Regulatory Commission (BERC)
State renewable energy agencyBihar Renewable Energy Development Agency (BREDA)
State solar policyBihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025 (issued 10 July 2025; in force for five years or until a new policy replaces it)
Rooftop metering for businessesNet or gross metering, up to the sanctioned load; draft change to a 500 kWp net metering cap is pending
Modelled solar outputabout 1,330 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 960 km from Munger in a straight line

Solar services in Munger

Munger: industrial areas

BIADA, the Bihar Industrial Area Development Authority, lists Industrial Estate, Munger among its industrial areas in Munger district.

The Government of India's One District One Product (ODOP) list names Lemon Grass and Mentha as the products of Munger district.

Solar output in Munger

A solar plant in Munger is modelled to produce about 1,330 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTIS-I, 11 kV, contract demand 50 to 1,500 kVA) energy charge of ₹7.98 per kVAh (BERC tariff order for NBPDCL and SBPDCL, dated 18 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The same rate applies in both NBPDCL and SBPDCL areas. A demand charge of ₹550 per kVA per month also applies. It is charged on the maximum demand recorded or 75% of the contract demand, whichever is higher, and demand above 105% of the contract demand is billed at twice the normal charge. The energy charge is ₹7.92 per kVAh for HTIS-II (33 kV, 500 to 15,000 kVA), ₹7.85 at 132 kV, ₹7.79 at 220 kV and ₹7.72 at 400 kV. Induction furnace consumers (HTSS) pay ₹4.94 per kVAh and ₹800 per kVA per month. Time-of-day rates apply to consumers above 10 kW from 1 April 2026: 80% of the energy charge from 9 am to 5 pm and 120% from 5 pm to 11 pm. The tariff is set without any Government of Bihar subsidy. It stays in force until 31 March 2027 or the next tariff order.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.98 per kVAh
100 kW1.3 lakh units1,000 sq m₹10.6 lakh
500 kW6.7 lakh units5,000 sq m₹53.1 lakh
1 MW13.3 lakh units10,000 sq m₹1.06 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Munger

For a rooftop array in Munger the strongest month is March, at about 140 units for each kW installed, and the weakest is July, at about 88. For a ground-mounted array at a 30° tilt the strongest month is March (about 147) and the weakest is July (about 80). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January111136
February116132
March140147
April138133
May129117
June10694
July8880
August9186
September9192
October106116
November106126
December106132

Somaya Solar projects near Munger

These are the Somaya Solar projects closest to Munger, with straight-line distances. They are shown as references and are not in Munger unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 640 km from Munger. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 710 km from Munger. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 860 km from Munger. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Munger

Which electricity company handles solar connections in Munger?

South Bihar Power Distribution Company Limited (SBPDCL) supplies electricity in Munger district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Munger?

Net or gross metering, up to the sanctioned load; draft change to a 500 kWp net metering cap is pending. The rule is the same across Bihar.

How much electricity does a solar plant generate in Munger?

About 1,330 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.3 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Munger?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 960 km from Munger in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 640 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Munger

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.