Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Nakur, Uttar Pradesh.

Nakur at a glance for solar projects

District and stateSaharanpur district, Uttar Pradesh
Electricity supplyPashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies electricity in Saharanpur district, one of the districts it lists as its area.
Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce
Modelled solar outputabout 1,400 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 140 km from Nakur in a straight line

Solar services in Nakur

Local points for solar projects in Nakur

The Government of India's One District One Product (ODOP) list names Wood Carving as the product of Saharanpur district.

Solar output in Nakur

A solar plant in Nakur is modelled to produce about 1,400 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.10 per kVAh
100 kW1.4 lakh units1,000 sq m₹9.9 lakh
500 kW7.0 lakh units5,000 sq m₹49.7 lakh
1 MW14.0 lakh units10,000 sq m₹99.4 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Nakur

For a rooftop array in Nakur the strongest month is May, at about 147 units for each kW installed, and the weakest is August, at about 100. For a ground-mounted array at a 33° tilt the strongest month is March (about 147) and the weakest is July (about 91). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January101130
February108128
March136147
April142139
May147133
June129113
July10191
August10096
September107110
October122140
November106134
December101135

Somaya Solar projects near Nakur

These are the Somaya Solar projects closest to Nakur, with straight-line distances. They are shown as references and are not in Nakur unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 70 km from Nakur. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 80 km from Nakur. Included net-metering coordination with the local electricity distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 160 km from Nakur. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Nakur

Which electricity company handles solar connections in Nakur?

Pashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies electricity in Saharanpur district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Nakur?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much electricity does a solar plant generate in Nakur?

About 1,400 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.0 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Nakur?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 140 km from Nakur in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 70 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Nakur

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image