Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Narnaul, Haryana. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Narnaul at a glance for solar projects
| District and state | Mahendragarh district, Haryana |
|---|---|
| Electricity supply | Dakshin Haryana Bijli Vitran Nigam Limited (DHBVN) supplies electricity in Mahendragarh district, one of the districts it lists as its area. |
| Electricity regulator | Haryana Electricity Regulatory Commission (HERC) |
| State renewable energy agency | Haryana Renewable Energy Development Agency, under the Department of New & Renewable Energy, Haryana (HAREDA) |
| State solar policy | Haryana Solar Power Policy, 2016 (notified 14 March 2016; in force until a new policy is notified) |
| Rooftop metering for businesses | Net metering up to 500 kW, within the sanctioned load |
| Modelled solar output | about 1,440 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 150 km from Narnaul in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Narnaul
In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.
The size limits, charges and other conditions for Haryana are on the page Solar EPC Company in Haryana.
In Narnaul the application for connection and metering goes to DHBVN.
What a plant produces in Narnaul
A solar plant in Narnaul is modelled to produce about 1,440 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Supply (above 50 kW), supply at 11 kV energy charge of ₹6.95 per kVAh (HERC tariff order of 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Energy charge only. The fixed charge is ₹290 per kVA of contract demand per month. Supply at 33 kV is ₹6.85 per kVAh and at 66 or 132 kV ₹6.75 per kVAh. Electricity duty, municipal tax and fuel surcharge adjustment (FSA) are extra. The rates are the same for UHBVN and DHBVN and did not change from 2025-26.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.95 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹10.0 lakh |
| 500 kW | 7.2 lakh units | 5,000 sq m | ₹50.0 lakh |
| 1 MW | 14.4 lakh units | 10,000 sq m | ₹1.00 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Narnaul: industrial areas
HSIIDC, the Haryana State Industrial and Infrastructure Development Corporation, lists Narnaul (Informal Sector) among its industrial areas in Mahendragarh district.
The Government of India's One District One Product (ODOP) list names Mustard Oil as the product of Mahendragarh district.
EPC projects by Somaya Solar near Narnaul
These are the Somaya Solar projects closest to Narnaul, with straight-line distances. They are shown as references and are not in Narnaul unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 250 km from Narnaul. In progress. Site access was difficult and was handled with local support.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 290 km from Narnaul. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 290 km from Narnaul. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Narnaul
Which electricity company handles solar connections in Narnaul?
Dakshin Haryana Bijli Vitran Nigam Limited (DHBVN) supplies electricity in Mahendragarh district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Narnaul?
Net metering up to 500 kW, within the sanctioned load. The rule is the same across Haryana.
How much electricity does a solar plant generate in Narnaul?
About 1,440 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.4 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Narnaul?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 150 km from Narnaul in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 250 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Narnaul
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DHBVN website, DHBVN at a glance
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Department of New & Renewable Energy, Haryana (HAREDA) website, and Haryana Solar Power Policy, 2016 (notified 14 March 2016)
- Directorate of Urban Local Bodies, Haryana: Municipalities - Key Figures (table S.No | District | MC Name | MC Type; page states data as on 11-11-2026)
- GeoNames (place coordinates, CC BY 4.0)
- HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering) Regulations, 2021, notified 19 July 2021, with the first amendment of 15 July 2024 and the second amendment of 30 October 2025 (as circulated in UHBVN Sales Circulars U-29/2021, U-33/2024 and U-16/2025)
- HSIIDC: list of Industrial Estates (IE) developed/being developed
- Haryana Government Gazette of 11 November 2025 (HERC notification of 30 October 2025), as circulated in UHBVN Sales Circular U-16/2025
- Haryana Solar Power Policy, 2016 (Renewable Energy Department, Government of Haryana, notification of 14 March 2016), with addenda of 19 May 2016 and 23 June 2017
- PVGIS, European Commission Joint Research Centre (solar output model)
- UHBVN Sales Circular U-03/2026 of 21 April 2026, schedule of tariff for 2026-27 under the HERC order of 25 March 2026 (same rates in DHBVN Sales Circular D-06/2026 of 13 May 2026)