Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Paralakhemundi, Odisha. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Local points for solar projects in Paralakhemundi
The Government of India's One District One Product (ODOP) list names Cashew Kernel, Granite Slab and Turmeric Oil as the products of Gajapati district.
Metering rules for business rooftops in Paralakhemundi
In Odisha, net metering for rooftop and other solar plants is set by an OERC order of 19 August 2016. The order covers all consumer categories, including industrial and commercial ones. The order has been amended on 17 January 2018, 5 May 2022 and 27 November 2025. Since the May 2022 amendment, net metering is allowed for loads up to 500 kW or the sanctioned load, whichever is lower.
The size limits, charges and other conditions for Odisha are on the page Commercial & Industrial Solar in Odisha.
In Paralakhemundi the application for connection and metering goes to TPSODL.
Output and bill value for a rooftop plant in Paralakhemundi
A solar plant in Paralakhemundi is modelled to produce about 1,300 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industry, HT, load factor 60% or less energy charge of ₹5.85 per kVAh (OERC common tariff order for 2026-27, dated 24 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The energy charge is ₹4.75 per kVAh when the monthly load factor is above 60%. A demand charge of ₹250 per kVA per month and a customer service charge of ₹250 per month also apply. Time-of-day tariff applies from 1 July 2026 to consumers with smart or AMR meters and contract demand above 10 kW: 10% less in solar hours (8 AM to 4 PM) and 1.1 times in peak hours (6 PM to midnight). The rates exclude electricity duty and other levies. The same rates apply in all four licensee areas.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹7.6 lakh |
| 250 kW | 3.2 lakh units | 2,500 sq m | ₹19.0 lakh |
| 500 kW | 6.5 lakh units | 5,000 sq m | ₹38.0 lakh |
| 1 MW | 13.0 lakh units | 10,000 sq m | ₹76.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Paralakhemundi
These are the Somaya Solar projects closest to Paralakhemundi, with straight-line distances. They are shown as references and are not in Paralakhemundi unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1100 km from Paralakhemundi. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1270 km from Paralakhemundi. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1380 km from Paralakhemundi. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Paralakhemundi
Which electricity company handles solar connections in Paralakhemundi?
TP Southern Odisha Distribution Limited (TPSODL) supplies electricity in Gajapati district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Paralakhemundi?
Net metering up to 500 kW or the sanctioned load, whichever is lower. The rule is the same across Odisha.
How much electricity does a solar plant generate in Paralakhemundi?
About 1,300 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.0 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Paralakhemundi?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1290 km from Paralakhemundi in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1100 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Paralakhemundi
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- OERC common tariff order for TPNODL, TPWODL, TPCODL and TPSODL for 2026-27, 24 March 2026, Table 1 licensed areas (txt-jhod/oerc-discom-order-2627.txt)
- OERC order on Net Metering / Bi-directional Metering of 19 August 2016, as amended up to 17 January 2018, by the order of 5 May 2022 and by the order of 27 November 2025
- OERC retail supply tariff notification for 2026-27, dated 24 March 2026 (schedule, item 23 and note on slab rate of energy charges)