Somaya Solar Solutions Limited delivers turnkey solar projects in Pherzawl, Manipur: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Pherzawl
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (MSPDCL) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Pherzawl
In Manipur, rooftop and other distributed solar falls under the MnERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, notified on 28 August 2026 and published in the Manipur Gazette on 3 September 2026. They repealed the earlier JERC metering regulations of 2016 that MnERC had adopted.
The size limits, charges and other conditions for Manipur are on the page Turnkey Solar EPC in Manipur.
In Pherzawl the application for connection and metering goes to MSPDCL.
What to expect from the plant in Pherzawl
A solar plant in Pherzawl is modelled to produce about 1,270 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industry (HT Category 5), contract demand above 125 kVA energy charge of ₹9.85 per kVAh (MnERC tariff order for MSPDCL for FY 2026-27, dated 14 May 2026, in force from 1 May 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹105 per kVA per month on the billing demand also applies. Option-2 time-of-day rates per kVAh: ₹7.88 from 9 AM to 5 PM, ₹11.82 from 6 to 9 AM and from 5 to 10 PM, and ₹9.85 from 10 PM to 6 AM; the consumer can start it only when MSPDCL has the metering and billing system ready. The schedule applies throughout the state. The corrigendum of 17 June 2026 changes only pole and tower usage charges.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹9.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹12.5 lakh |
| 500 kW | 6.3 lakh units | 5,000 sq m | ₹62.5 lakh |
| 1 MW | 12.7 lakh units | 10,000 sq m | ₹1.25 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Pherzawl
These are the Somaya Solar projects closest to Pherzawl, with straight-line distances. They are shown as references and are not in Pherzawl unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1300 km from Pherzawl. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1390 km from Pherzawl. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1510 km from Pherzawl. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Pherzawl
Which electricity company handles solar connections in Pherzawl?
Manipur State Power Distribution Company Limited (MSPDCL) is the distribution utility for Manipur and supplies Pherzawl district.
Is net metering available for factories and commercial buildings in Pherzawl?
Net billing for businesses, 1 kW to 500 kW within sanctioned load; gross metering up to 10 MW. The rule is the same across Manipur.
How much electricity does a solar plant generate in Pherzawl?
About 1,270 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Pherzawl?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1640 km from Pherzawl in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1300 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Pherzawl
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- MnERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026, notification of 28 August 2026 (Manipur Gazette Extraordinary No. 190, 3 September 2026)
- MnERC tariff order for MSPDCL for FY 2026-27, dated 14 May 2026 (Chapter 12, tariff schedule, H.T. Category 5)
- MnERC tariff order for MSPDCL, FY 2026-27 (14 May 2026), para 1.2