Somaya Solar Solutions Limited builds ground-mounted solar power plants in Pulwama, Jammu and Kashmir for businesses that want their own power and for landowners and developers who sell power to the grid.

Output and land for a ground-mounted plant in Pulwama

A solar plant in Pulwama is modelled to produce about 1,560 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (36°).

Plant sizeModelled output a yearLand needed (typical)
1 MW15.6 lakh units4 to 5 acres
2 MW31.2 lakh units8 to 10 acres
5 MW78.0 lakh units20 to 25 acres

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

State policy and open access in Jammu and Kashmir

Under JERC's Green Energy Open Access Regulations, 2024 (notified on 12 February 2024), a consumer with a contract demand or sanctioned load of 100 kW or more, on one connection or on several in the same electricity division, can take green energy through open access. A captive consumer has no load limit.

The charges, exemptions and conditions for Jammu and Kashmir are on the page Ground-Mounted Solar Plant in Jammu and Kashmir.

What a ground-mounted project involves

A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.

  • Land check: title, slope, soil, drainage, access road and shading
  • Distance to the substation or connection point and the line needed to reach it
  • Layout, structure design and foundations for the soil
  • Supply, installation, testing and commissioning
  • Evacuation line, metering and connection approvals
  • Fencing, cleaning water and maintenance planning

More detail: Ground-Mounted Solar Plant across India.

Ground-mounted projects by Somaya Solar near Pulwama

These are the Somaya Solar projects closest to Pulwama, with straight-line distances. They are shown as references and are not in Pulwama unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 650 km from Pulwama. In progress. Site access was difficult and was handled with local support.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1240 km from Pulwama. Completed, including the transmission line work coordinated with the local distribution company.

See all published projects

Questions about solar projects in Pulwama

Which electricity company handles solar connections in Pulwama?

Kashmir Power Distribution Corporation Limited (KPDCL) supplies electricity in Pulwama district, one of the districts it lists as its area.

How much electricity does a solar plant generate in Pulwama?

About 1,560 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.6 lakh units a year. A site study gives the figure to plan on.

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based, and how far is that from Pulwama?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 630 km from Pulwama in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 650 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Pulwama

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image