Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Rajaori, Jammu and Kashmir.

Rajaori at a glance for solar projects

District and stateRajouri district, Jammu and Kashmir
Electricity supplyJammu Power Distribution Corporation Limited (JPDCL) supplies electricity in Rajouri district, one of the districts it lists as its area.
Electricity regulatorJoint Electricity Regulatory Commission for the UT of Jammu & Kashmir and the UT of Ladakh (JERC)
State renewable energy agencyJammu and Kashmir Energy Development Agency (JAKEDA)
Rooftop metering for businessesNet metering up to 500 kW; net billing above 500 kW up to 1 MW
Modelled solar outputabout 1,360 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 600 km from Rajaori in a straight line

Solar services in Rajaori

Local points for solar projects in Rajaori

The Government of India's One District One Product (ODOP) list names Walnut as the product of Rajouri district.

Solar output in Rajaori

A solar plant in Rajaori is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial Supply (Schedule 6), 11 kV, sanctioned load above 100 kW and up to 1 MVA energy charge of ₹4.50 per kVAh (JERC tariff order No. 06 of 2026 for JPDCL and KPDCL, dated 20 August 2026, applicable to energy used from 1 September 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. One schedule covers both JPDCL and KPDCL. A demand charge of ₹184 per kVA per month also applies, on billing demand. The energy charge is 10 paise lower at 33 kV and 20 paise lower at 66 kV and above. Time-of-day tariff applies: a 20% surcharge on energy charges from 6 am to 9 am and from 5 pm to 10 pm, and a 20% rebate from 9 am to 5 pm. These are the subsidised rates that the licensees must bill; the order counts ₹2,420.78 crore of support from the UT government. HT power-intensive industries (Schedule 7) pay ₹5.30 per kVAh at 11 kV and ₹5.25 at 33 kV, with a demand charge of ₹236 per kVA per month.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.50 per kVAh
100 kW1.4 lakh units1,000 sq m₹6.1 lakh
500 kW6.8 lakh units5,000 sq m₹30.6 lakh
1 MW13.6 lakh units10,000 sq m₹61.2 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Rajaori

For a rooftop array in Rajaori the strongest month is May, at about 143 units for each kW installed, and the weakest is January, at about 91. For a ground-mounted array at a 36° tilt the strongest month is October (about 140) and the weakest is July (about 100). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January91124
February93114
March121133
April133132
May143132
June134118
July111100
August110105
September115122
October118140
November97127
December92129

Somaya Solar projects near Rajaori

These are the Somaya Solar projects closest to Rajaori, with straight-line distances. They are shown as references and are not in Rajaori unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 520 km from Rajaori. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 530 km from Rajaori. Included net-metering coordination with the local electricity distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 640 km from Rajaori. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Rajaori

Which electricity company handles solar connections in Rajaori?

Jammu Power Distribution Corporation Limited (JPDCL) supplies electricity in Rajouri district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Rajaori?

Net metering up to 500 kW; net billing above 500 kW up to 1 MW. The rule is the same across Jammu and Kashmir.

How much electricity does a solar plant generate in Rajaori?

About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Rajaori?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 600 km from Rajaori in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 520 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Rajaori

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image