Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Rewari, Haryana as an EPC contractor: engineering, supply, construction and commissioning.
What Haryana's policy says about large solar plants
The Haryana Solar Power Policy, 2016 is the state's notified solar policy. It came into force on 14 March 2016 and stays in force until a new policy is notified. The state published a draft Haryana Solar Power Policy, 2023 for public comments, but the state agency's policy page still lists it as a draft.
Under Haryana's Green Energy Open Access Regulations, 2023, as amended on 25 February 2025, a consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access. The 100 kW can be one connection or several connections in the same operation division of a distribution company.
The charges, exemptions and conditions for Haryana are on the page Utility-Scale Solar in Haryana.
Output and land at megawatt scale in Rewari
A solar plant in Rewari is modelled to produce about 1,520 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (32°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 76.0 lakh units | 20 to 25 acres |
| 10 MW | 1.52 crore units | 40 to 50 acres |
| 25 MW | 3.80 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Rewari
These are the Somaya Solar projects closest to Rewari, with straight-line distances. They are shown as references and are not in Rewari unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 200 km from Rewari. In progress. Site access was difficult and was handled with local support.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 610 km from Rewari. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Rewari
Which electricity company handles solar connections in Rewari?
Dakshin Haryana Bijli Vitran Nigam Limited (DHBVN) supplies electricity in Rewari district, one of the 12 districts it lists as its area.
How much electricity does a solar plant generate in Rewari?
About 1,520 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.2 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Rewari?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 100 km from Rewari in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 200 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Rewari
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DHBVN website: DHBVN at a glance (districts served)
- GeoNames (place coordinates, CC BY 4.0)
- HERC (Green Energy Open Access) Regulations, 2023, notified 24 April 2023, with the first amendment of 25 February 2025 (UHBVN Sales Circulars U-07/2023 and U-02/2025), and the 2026-27 tariff schedule (UHBVN Sales Circulars U-03/2026 of 21 April 2026 and U-06/2026 of 13 May 2026)
- Haryana Solar Power Policy, 2016 (Renewable Energy Department, Government of Haryana, notification of 14 March 2016), with addenda of 19 May 2016 and 23 June 2017
- PVGIS, European Commission Joint Research Centre (solar output model)