Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Sangli, Maharashtra.
Sangli at a glance for solar projects
| District and state | Sangli district, Maharashtra |
|---|---|
| Electricity supply | Maharashtra State Electricity Distribution Company Limited (MSEDCL) supplies electricity across Maharashtra apart from Mumbai and a few small areas with their own licensees (such as some IT parks and SEZs), including Sangli. |
| Electricity regulator | Maharashtra Electricity Regulatory Commission (MERC) |
| State renewable energy agency | Maharashtra Energy Development Agency (MEDA) |
| State solar policy | Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36 (Government Resolution of 18 March 2026, in force until 31 March 2036) |
| Rooftop metering for businesses | Net metering up to 5 MW or the contract demand, whichever is lower; net billing and gross metering also allowed |
| Modelled solar output | about 1,380 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1340 km from Sangli in a straight line |
Solar services in Sangli
- Solar EPC Company in Sangli
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Sangli
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Sangli
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Sangli
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Sangli
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Sangli
One contract from survey to a working plant, with approvals and handover included.
Sangli: industrial areas
MIDC, the Maharashtra Industrial Development Corporation, lists Sangli-Kupwad, Sangli-Miraj and Sangli (IT Park) among its industrial areas.
The Government of India's One District One Product (ODOP) list names Turmeric and Pump Spares as the products of Sangli district.
Solar output in Sangli
A solar plant in Sangli is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the MSEDCL HT I (A): HT - Industry energy charge of ₹8.44 per kVAh (MERC order of 25 March 2026 in Case No. 75 of 2025 (review of MSEDCL's MYT order of 28 March 2025), rates for 2026-27 in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is MSEDCL's energy charge for 2026-27. HT consumers (11 kV to 33 kV) also pay a wheeling charge of ₹0.81 per kVAh, for a total of ₹9.25. EHV consumers (66 kV and above) pay no wheeling charge. A demand charge of ₹650 per kVA per month also applies. Time of day: energy used from 9 AM to 5 PM gets a rebate of 15% of the energy charge from April to September and 25% from October to March. Energy used from 5 PM to midnight costs 20% more. The tariffs exclude electricity duty and taxes. Mumbai licensees have their own MERC orders of 28 March 2025 with lower 2026-27 rates for HT I industry, each with a demand charge of ₹400 per kVA per month: AEML ₹5.73 per kVAh plus ₹0.57 wheeling, Tata Power-D ₹5.67 plus ₹0.69, and BEST ₹5.47 plus ₹0.88.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.44 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹11.6 lakh |
| 500 kW | 6.9 lakh units | 5,000 sq m | ₹58.2 lakh |
| 1 MW | 13.8 lakh units | 10,000 sq m | ₹1.16 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Sangli
For a rooftop array in Sangli the strongest month is March, at about 143 units for each kW installed, and the weakest is July, at about 81. For a ground-mounted array at a 22° tilt the strongest month is January (about 147) and the weakest is July (about 75). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 132 | 147 |
| February | 129 | 138 |
| March | 143 | 146 |
| April | 133 | 129 |
| May | 133 | 124 |
| June | 95 | 88 |
| July | 81 | 75 |
| August | 88 | 84 |
| September | 94 | 93 |
| October | 115 | 120 |
| November | 114 | 125 |
| December | 122 | 137 |
Somaya Solar projects near Sangli
These are the Somaya Solar projects closest to Sangli, with straight-line distances. They are shown as references and are not in Sangli unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 980 km from Sangli. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1340 km from Sangli. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1400 km from Sangli. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Sangli
Which electricity company handles solar connections in Sangli?
Maharashtra State Electricity Distribution Company Limited (MSEDCL) supplies electricity across Maharashtra apart from Mumbai and a few small areas with their own licensees (such as some IT parks and SEZs), including Sangli.
Is net metering available for factories and commercial buildings in Sangli?
Net metering up to 5 MW or the contract demand, whichever is lower; net billing and gross metering also allowed. The rule is the same across Maharashtra.
How much electricity does a solar plant generate in Sangli?
About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Sangli?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1340 km from Sangli in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 980 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Sangli
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- District Sangli website: Sangli, Miraj and Kupwad Municipal Corporation
- GeoNames (place coordinates, CC BY 4.0)
- MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 (30 December 2019), First Amendment Regulations, 2023 (Gazette, 16 November 2023) and Second Amendment Regulations, 2024 (29 August 2024); MERC practice direction of 30 June 2026; MERC order of 25 March 2026 in Case No. 75 of 2025 (MSEDCL); MERC MYT order of 28 March 2025 in Case No. 217 of 2024
- MERC order dated 25 March 2026 in Case No. 75 of 2025 (MSEDCL), Summary of HT Tariff for FY 2026-27 and Table 8; MERC MYT orders of 28 March 2025 for AEML-D (Case No. 211 of 2024), TPC-D (Case No. 210 of 2024) and BEST (Case No. 207 of 2024)
- MIDC Land Bank, industrial plot list (columns: Regional Office | Industrial Area), land.midcindia.org, read 2026-11-18
- MSEDCL website: company profile
- Maharashtra Electricity Regulatory Commission
- Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, Government Resolution No. अपाऊ-2025/प्र.क्र.22/ऊर्जा-7 dated 18 March 2026; Energy Department FAQ on the policy, version 3.0, October 2026 (both on the MEDA website)
- Maharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36, Government Resolution of 18 March 2026 (Industries, Energy, Labour and Mining Department, Government of Maharashtra), sections 8.1 and 9.6
- PVGIS, European Commission Joint Research Centre (solar output model)