Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Sawar, Rajasthan.
Sawar at a glance for solar projects
| District and state | Ajmer district, Rajasthan |
|---|---|
| Electricity supply | Ajmer Vidyut Vitran Nigam Limited (AVVNL) supplies electricity in Ajmer district, one of the districts it lists as its area. |
| Electricity regulator | Rajasthan Electricity Regulatory Commission (RERC) |
| State renewable energy agency | Rajasthan Renewable Energy Corporation Limited (RREC) |
| State solar policy | Rajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 1 MW, within the sanctioned load |
| Modelled solar output | about 1,430 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 390 km from Sawar in a straight line |
Solar services in Sawar
- Solar EPC Company in Sawar
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Sawar
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Sawar
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Sawar
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Sawar
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Sawar
One contract from survey to a working plant, with approvals and handover included.
Sawar: industrial areas
RIICO, the Rajasthan State Industrial Development and Investment Corporation, lists Sawar among its industrial areas in Ajmer district.
The Government of India's One District One Product (ODOP) list names Granite and Marble Products as the product of Ajmer district.
Solar output in Sawar
A solar plant in Sawar is modelled to produce about 1,430 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.50 per unit |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.3 lakh |
| 500 kW | 7.2 lakh units | 5,000 sq m | ₹46.5 lakh |
| 1 MW | 14.3 lakh units | 10,000 sq m | ₹93.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Sawar
For a rooftop array in Sawar the strongest month is May, at about 146 units for each kW installed, and the weakest is August, at about 88. For a ground-mounted array at a 30° tilt the strongest month is March (about 150) and the weakest is August (about 84). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 117 | 144 |
| February | 121 | 139 |
| March | 142 | 150 |
| April | 145 | 140 |
| May | 146 | 132 |
| June | 123 | 109 |
| July | 95 | 86 |
| August | 88 | 84 |
| September | 108 | 110 |
| October | 126 | 140 |
| November | 111 | 133 |
| December | 111 | 138 |
Somaya Solar projects near Sawar
These are the Somaya Solar projects closest to Sawar, with straight-line distances. They are shown as references and are not in Sawar unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 470 km from Sawar. In progress. Site access was difficult and was handled with local support.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 520 km from Sawar. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 530 km from Sawar. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Sawar
Which electricity company handles solar connections in Sawar?
Ajmer Vidyut Vitran Nigam Limited (AVVNL) supplies electricity in Ajmer district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Sawar?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.
How much electricity does a solar plant generate in Sawar?
About 1,430 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.3 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Sawar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 390 km from Sawar in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 470 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Sawar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- AVVNL website (energy.rajasthan.gov.in/avvnl), About Us > About Department
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- RERC rooftop (grid-interactive distributed renewable energy) regulations, 2021, with amendments to December 2025, and RERC order of 7 February 2024
- RERC tariff order for 2026-27, dated 30 March 2026
- RIICO: Land Availability, item 6 "Layout Plan of Industrial Areas (updated on 03.09.2026)", listed by RIICO unit office
- Rajasthan Electricity Regulatory Commission
- Rajasthan Integrated Clean Energy Policy, 2024 (Energy Department, Government of Rajasthan)
- Rajasthan State Open School, Jaipur: list of AI Centres 2026-2027 (row: centre | district | block)