Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Shantipur, West Bengal as an EPC contractor: engineering, supply, construction and commissioning.
What West Bengal's policy says about large solar plants
Under WBERC's Open Access Regulations, 2022, a consumer with a contracted demand or sanctioned load of 100 kW or more can take green energy through green energy open access. There is no load limit for captive consumers taking power under green energy open access.
The charges, exemptions and conditions for West Bengal are on the page Utility-Scale Solar in West Bengal.
Output and land at megawatt scale in Shantipur
A solar plant in Shantipur is modelled to produce about 1,330 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (28°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 66.5 lakh units | 20 to 25 acres |
| 10 MW | 1.33 crore units | 40 to 50 acres |
| 25 MW | 3.33 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Shantipur
These are the Somaya Solar projects closest to Shantipur, with straight-line distances. They are shown as references and are not in Shantipur unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 820 km from Shantipur. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1180 km from Shantipur. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Shantipur
Which electricity company handles solar connections in Shantipur?
West Bengal State Electricity Distribution Company Limited (WBSEDCL) supplies electricity in Nadia district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Shantipur?
About 1,330 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.3 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Shantipur?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1250 km from Shantipur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 820 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Shantipur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- WBERC (Open Access) Regulations, 2022, Notification No. 75/WBERC of 1 August 2022; WBERC tariff order for WBSEDCL for 2025-26, dated 20 March 2025 (chapter 4 and Annexure 4B)
- WBSEDCL annual report 2024-25 (Management Discussion and Analysis), list of regional offices