Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Silvassa, Dadra and Nagar Haveli and Daman and Diu. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Silvassa at a glance for solar projects
| District and state | Dadra and Nagar Haveli district, Dadra and Nagar Haveli and Daman and Diu |
|---|---|
| Electricity supply | Dadra and Nagar Haveli and Daman and Diu Power Distribution Corporation Limited (DNHDDPDCL) supplies Silvassa, which the cited source places in its supply area. |
| Electricity regulator | Joint Electricity Regulatory Commission for the State of Goa and Union Territories (JERC) |
| Rooftop metering for businesses | Net metering up to 500 kWp, within the sanctioned load |
| Modelled solar output | about 1,370 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1040 km from Silvassa in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Silvassa
In Dadra and Nagar Haveli and Daman and Diu, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.
The size limits, charges and other conditions for Dadra and Nagar Haveli and Daman and Diu are on the page Solar EPC Company in Dadra and Nagar Haveli and Daman and Diu.
In Silvassa the application for connection and metering goes to DNHDDPDCL.
What a plant produces in Silvassa
A solar plant in Silvassa is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTS-IV, 11/33 kV, contract demand above 100 kVA and up to 5,000 kVA) energy charge of ₹4.80 per kVAh (JERC Tariff Order of 25 September 2025 for DNH and DD Power Distribution Corporation Limited (Petition No. 145 of 2025), in force from 1 October 2025, which sets tariffs for each year from 2025-26 to 2029-30. ₹4.80 is the energy charge it approves for 2026-27.). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹455 per kVA per month also applies, billed on the recorded maximum demand or 85% of the contract demand, whichever is higher. A tariff surcharge of 8.77% applies from 1 July 2026 to 31 March 2027 (the 5.00% approved in September 2025 plus 3.77% approved in the JERC true-up order of 16 June 2026). Time-of-day tariff is mandatory for HT consumers, except those with captive power plants or taking wheeled power: 0.8 times the energy charge in solar hours and 1.2 times in peak hours. Supply at 33 kV gets a 3% rebate on the energy charge. Electricity duty, taxes and any fuel and power purchase cost adjustment surcharge are extra. Industrial supply at 66 kV and above with contract demand over 5,000 kVA (EHTS-II) is ₹4.70 per kVAh with a fixed charge of ₹580 per kVA per month. DNHDDPDCL is the only licensee.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹4.80 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹6.6 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹32.9 lakh |
| 1 MW | 13.7 lakh units | 10,000 sq m | ₹65.8 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Silvassa: industrial areas
The MSME Development Institute's industrial profile of Dadra and Nagar Haveli district (Government of India) names Government Industrial Estate, Phase-I, Piparia,Silvassa and Government Industrial Estate, Phase-Ii, Piparia,Silvassa.
The Government of India's One District One Product (ODOP) list names Textile (Yarn) as the product of Dadra and Nagar Haveli district.
EPC projects by Somaya Solar near Silvassa
These are the Somaya Solar projects closest to Silvassa, with straight-line distances. They are shown as references and are not in Silvassa unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 860 km from Silvassa. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1100 km from Silvassa. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1110 km from Silvassa. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Silvassa
Which electricity company handles solar connections in Silvassa?
Dadra and Nagar Haveli and Daman and Diu Power Distribution Corporation Limited (DNHDDPDCL) supplies Silvassa, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Silvassa?
Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Dadra and Nagar Haveli and Daman and Diu.
How much electricity does a solar plant generate in Silvassa?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Silvassa?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1040 km from Silvassa in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 860 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Silvassa
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DNHDDPDCL: source naming Silvassa within its supply area
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Dadra & Nagar Haveli District Website
- GeoNames (place coordinates, CC BY 4.0)
- JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 (No. JERC-24/2019, notified 24 July 2019) and the Net Metering & Gross Metering (First Amendment) Regulations, 2024 (notified 1 August 2024, Gazette of India 11 September 2024)
- JERC Tariff Order for DNH and DD Power Distribution Corporation Limited, Petition No. 145 of 2025, dated 25 September 2025 (section 1.1)
- JERC Tariff Order, Truing up for FY 2023-24, APR for FY 2024-25 and ARR and Determination of Tariff for MYT Control Period FY 2025-26 to FY 2029-30, Petition No. 145 of 2025, DNH and DD Power Distribution Corporation Limited, dated 25 September 2025 (Table 10-1), and JERC True-up Order of 16 June 2026 (Petition No. 165 of 2026)
- MSME-DI (Government of India): District Industrial Profile, Dadra & Nagar Haveli
- PVGIS, European Commission Joint Research Centre (solar output model)