Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Silvassa, Dadra and Nagar Haveli and Daman and Diu. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Silvassa: industrial areas

The MSME Development Institute's industrial profile of Dadra and Nagar Haveli district (Government of India) names Government Industrial Estate, Phase-I, Piparia,Silvassa and Government Industrial Estate, Phase-Ii, Piparia,Silvassa.

The Government of India's One District One Product (ODOP) list names Textile (Yarn) as the product of Dadra and Nagar Haveli district.

Metering rules for business rooftops in Silvassa

In Dadra and Nagar Haveli and Daman and Diu, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.

The size limits, charges and other conditions for Dadra and Nagar Haveli and Daman and Diu are on the page Commercial & Industrial Solar in Dadra and Nagar Haveli and Daman and Diu.

In Silvassa the application for connection and metering goes to DNHDDPDCL.

Output and bill value for a rooftop plant in Silvassa

A solar plant in Silvassa is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTS-IV, 11/33 kV, contract demand above 100 kVA and up to 5,000 kVA) energy charge of ₹4.80 per kVAh (JERC Tariff Order of 25 September 2025 for DNH and DD Power Distribution Corporation Limited (Petition No. 145 of 2025), in force from 1 October 2025, which sets tariffs for each year from 2025-26 to 2029-30. ₹4.80 is the energy charge it approves for 2026-27.). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹455 per kVA per month also applies, billed on the recorded maximum demand or 85% of the contract demand, whichever is higher. A tariff surcharge of 8.77% applies from 1 July 2026 to 31 March 2027 (the 5.00% approved in September 2025 plus 3.77% approved in the JERC true-up order of 16 June 2026). Time-of-day tariff is mandatory for HT consumers, except those with captive power plants or taking wheeled power: 0.8 times the energy charge in solar hours and 1.2 times in peak hours. Supply at 33 kV gets a 3% rebate on the energy charge. Electricity duty, taxes and any fuel and power purchase cost adjustment surcharge are extra. Industrial supply at 66 kV and above with contract demand over 5,000 kVA (EHTS-II) is ₹4.70 per kVAh with a fixed charge of ₹580 per kVA per month. DNHDDPDCL is the only licensee.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.80 per kVAh
100 kW1.4 lakh units1,000 sq m₹6.6 lakh
250 kW3.4 lakh units2,500 sq m₹16.4 lakh
500 kW6.8 lakh units5,000 sq m₹32.9 lakh
1 MW13.7 lakh units10,000 sq m₹65.8 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Silvassa

These are the Somaya Solar projects closest to Silvassa, with straight-line distances. They are shown as references and are not in Silvassa unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1100 km from Silvassa. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1160 km from Silvassa. Completed in two months, with five years of operation and maintenance.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 1190 km from Silvassa. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.

See all published projects

Questions about solar projects in Silvassa

Which electricity company handles solar connections in Silvassa?

Dadra and Nagar Haveli and Daman and Diu Power Distribution Corporation Limited (DNHDDPDCL) supplies Silvassa, which the cited source places in its supply area.

Is net metering available for factories and commercial buildings in Silvassa?

Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Dadra and Nagar Haveli and Daman and Diu.

How much electricity does a solar plant generate in Silvassa?

About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Silvassa?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1040 km from Silvassa in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1100 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Silvassa

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image