Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Surajgarh, Rajasthan as an EPC contractor: engineering, supply, construction and commissioning.
What Rajasthan's policy says about large solar plants
The Rajasthan Integrated Clean Energy Policy, 2024 is the state's current policy for solar and other renewable projects. It stays in force until 29 March 2029 unless another policy replaces it.
Under Rajasthan's Green Energy Open Access Regulations, 2025, a consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access.
The charges, exemptions and conditions for Rajasthan are on the page Utility-Scale Solar in Rajasthan.
Output and land at megawatt scale in Surajgarh
A solar plant in Surajgarh is modelled to produce about 1,540 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (32°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 77.0 lakh units | 20 to 25 acres |
| 10 MW | 1.54 crore units | 40 to 50 acres |
| 25 MW | 3.85 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Surajgarh
These are the Somaya Solar projects closest to Surajgarh, with straight-line distances. They are shown as references and are not in Surajgarh unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 280 km from Surajgarh. In progress. Site access was difficult and was handled with local support.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 680 km from Surajgarh. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Surajgarh
Which electricity company handles solar connections in Surajgarh?
Ajmer Vidyut Vitran Nigam Limited (AVVNL) supplies electricity in Jhunjhunu district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Surajgarh?
About 1,540 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.4 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Surajgarh?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 170 km from Surajgarh in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 280 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Surajgarh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- AVVNL website (energy.rajasthan.gov.in/avvnl), About Us > About Department
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2025, gazetted 17 July 2025
- Rajasthan Integrated Clean Energy Policy, 2024 (Energy Department, Government of Rajasthan)