Somaya Solar Solutions Limited delivers turnkey solar projects in Thanesar, Haryana: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Thanesar
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (UHBVN) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Thanesar
In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.
The size limits, charges and other conditions for Haryana are on the page Turnkey Solar EPC in Haryana.
In Thanesar the application for connection and metering goes to UHBVN.
What to expect from the plant in Thanesar
A solar plant in Thanesar is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Supply (above 50 kW), supply at 11 kV energy charge of ₹6.95 per kVAh (HERC tariff order of 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Energy charge only. The fixed charge is ₹290 per kVA of contract demand per month. Supply at 33 kV is ₹6.85 per kVAh and at 66 or 132 kV ₹6.75 per kVAh. Electricity duty, municipal tax and fuel surcharge adjustment (FSA) are extra. The rates are the same for UHBVN and DHBVN and did not change from 2025-26.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.95 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.8 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹49.0 lakh |
| 1 MW | 14.1 lakh units | 10,000 sq m | ₹98.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Thanesar
These are the Somaya Solar projects closest to Thanesar, with straight-line distances. They are shown as references and are not in Thanesar unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 120 km from Thanesar. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 130 km from Thanesar. Included net-metering coordination with the local electricity distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 200 km from Thanesar. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Thanesar
Which electricity company handles solar connections in Thanesar?
Uttar Haryana Bijli Vitran Nigam Limited (UHBVN) supplies electricity in Kurukshetra district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Thanesar?
Net metering up to 500 kW, within the sanctioned load. The rule is the same across Haryana.
How much electricity does a solar plant generate in Thanesar?
About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Thanesar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 160 km from Thanesar in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 120 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Thanesar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering) Regulations, 2021, notified 19 July 2021, with the first amendment of 15 July 2024 and the second amendment of 30 October 2025 (as circulated in UHBVN Sales Circulars U-29/2021, U-33/2024 and U-16/2025)
- PVGIS, European Commission Joint Research Centre (solar output model)
- UHBVN Sales Circular U-03/2026 of 21 April 2026, schedule of tariff for 2026-27 under the HERC order of 25 March 2026 (same rates in DHBVN Sales Circular D-06/2026 of 13 May 2026)
- UHBVN website, About UHBVN