Turnkey Solar EPC Solutions in Thiruvananthapuram

Somaya Solar Solutions Limited delivers turnkey solar projects in Thiruvananthapuram, Kerala: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Thiruvananthapuram

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (KSEB Ltd) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Thiruvananthapuram

In Kerala an industrial consumer can install rooftop or other solar of 1 kW to 500 kW under net metering, within the connected load or contract demand. Larger plants go under net billing (up to 1,000 kW, or 3,000 kW with storage) or gross metering (up to 3,000 kW). The rules are in the KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified on 5 November 2025. They replaced the 2020 net metering regulations, and KSERC's list shows no later amendment.

The size limits, charges and other conditions for Kerala are on the page Turnkey Solar EPC in Kerala.

In Thiruvananthapuram the application for connection and metering goes to KSEB.

What to expect from the plant in Thiruvananthapuram

A solar plant in Thiruvananthapuram is modelled to produce about 1,440 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I(A) Industry (high tension, 11 kV to 33 kV) energy charge of ₹6.25 per unit (KSERC order of 5 December 2024 in OP 18/2023: schedule of tariff for 5 December 2024 to 31 March 2027; the rate shown applies from 1 April 2025). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The energy charge was ₹6.20 per unit from 5 December 2024 to 31 March 2025. A demand charge also applies each month: ₹420 per kVA of billing demand from 1 April 2025. Billing demand is the recorded maximum demand or 75% of the contract demand, whichever is higher. HT consumers are billed on time of day: 100% of the rate from 6:00 to 18:00, 150% from 18:00 to 22:00 and 75% from 22:00 to 6:00. The schedule applies to KSEB Ltd and the other licensees, and the rates exclude electricity duty and surcharge.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.25 per unit
100 kW1.4 lakh units1,000 sq m₹9.0 lakh
500 kW7.2 lakh units5,000 sq m₹45.0 lakh
1 MW14.4 lakh units10,000 sq m₹90.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Thiruvananthapuram

These are the Somaya Solar projects closest to Thiruvananthapuram, with straight-line distances. They are shown as references and are not in Thiruvananthapuram unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1750 km from Thiruvananthapuram. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 2180 km from Thiruvananthapuram. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 2280 km from Thiruvananthapuram. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Thiruvananthapuram

Which electricity company handles solar connections in Thiruvananthapuram?

KSEB Ltd, the state electricity board company, supplies Thiruvananthapuram district outside the small areas held by special licensees such as industrial parks.

Is net metering available for factories and commercial buildings in Thiruvananthapuram?

Net metering up to 500 kW for industrial consumers; net billing up to 1 MW (3 MW with storage). The rule is the same across Kerala.

How much electricity does a solar plant generate in Thiruvananthapuram?

About 1,440 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.4 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Thiruvananthapuram?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 2240 km from Thiruvananthapuram in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1750 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Thiruvananthapuram

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.