Turnkey Solar EPC Solutions in Kerala

Somaya Solar Solutions Limited delivers turnkey solar projects in Kerala: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Kerala

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Kerala

In Kerala an industrial consumer can install rooftop or other solar of 1 kW to 500 kW under net metering, within the connected load or contract demand. Larger plants go under net billing (up to 1,000 kW, or 3,000 kW with storage) or gross metering (up to 3,000 kW). The rules are in the KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified on 5 November 2025. They replaced the 2020 net metering regulations, and KSERC's list shows no later amendment.

  • Industrial net metering plants above 25 kW and up to 100 kW need a hybrid inverter with storage of at least 10% of the plant's energy generation potential. Above 100 kW and up to 500 kW the storage must be at least 20%.
  • The plant may not be larger than the connected load in kW or the contract demand in kVA.
  • Net billing is open to all consumers up to the lower of the connected load or contract demand and 1,000 kW. With storage of at least 30% of the plant's energy generation potential the limit is 3,000 kW.
  • Gross metering is open to all consumers, for plants of 1 kW to 3,000 kW.
  • Group net metering lets a consumer use the excess power at another premises of its own in the area of the same licensee. Virtual net metering is for groups such as residential complexes, government offices and MSMEs of up to 10 kW; it is not open to ordinary industrial consumers.
  • For new industrial net metering plants above 25 kW, exports are set off against imports zone by zone, and surplus is paid at the feed-in tariff set by the Commission.
  • Industrial net metering consumers pay grid support charges on grid power used in non-solar hours, up to the banked energy set off: 50 paise per kWh for the first 300 units and ₹1 per kWh after that, until the Commission fixes the charge in a tariff order.
  • Surplus carried forward loses 2% of the balance units a month. Balance at year end is paid at ₹2.79 per kWh for new solar prosumers and at the APPC rate of ₹3.08 per kWh for existing prosumers, as set in the regulations.
  • The energy accounting, billing and settlement rules of the 2025 regulations apply from 1 January 2026. Existing net metering prosumers stay under net metering until they change system or increase capacity.

What to expect from the plant in Kerala

Solar output changes across Kerala with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,240 to 1,440 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Alappuzha1,2801,290
Kochi1,2401,240
Kollam1,4001,400
Kozhikode1,2501,260
Thiruvananthapuram1,4401,440

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Questions about solar projects in Kerala

Is net metering available for factories and commercial buildings in Kerala?

In Kerala an industrial consumer can install rooftop or other solar of 1 kW to 500 kW under net metering, within the connected load or contract demand. Larger plants go under net billing (up to 1,000 kW, or 3,000 kW with storage) or gross metering (up to 3,000 kW). The rules are in the KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified on 5 November 2025. They replaced the 2020 net metering regulations, and KSERC's list shows no later amendment.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Kerala

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image