Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Tuensang, Nagaland as an EPC contractor: engineering, supply, construction and commissioning.
What Nagaland's policy says about large solar plants
Under NERC's Open Access Regulations, 2012, open access is permitted to consumers seeking it for a capacity of 1 MW and above. NERC's Green Energy Open Access charges regulations of 30 September 2024 cover consumers with a contracted demand or sanctioned load of 100 kW or more, except captive users.
The charges, exemptions and conditions for Nagaland are on the page Utility-Scale Solar in Nagaland.
Output and land at megawatt scale in Tuensang
A solar plant in Tuensang is modelled to produce about 1,190 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (29°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 59.5 lakh units | 20 to 25 acres |
| 10 MW | 1.19 crore units | 40 to 50 acres |
| 25 MW | 2.98 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Tuensang
These are the Somaya Solar projects closest to Tuensang, with straight-line distances. They are shown as references and are not in Tuensang unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1480 km from Tuensang. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1640 km from Tuensang. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Tuensang
Which electricity company handles solar connections in Tuensang?
Department of Power, Government of Nagaland (DoPN) is the distribution utility for Nagaland and supplies Tuensang district.
How much electricity does a solar plant generate in Tuensang?
About 1,190 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.9 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Tuensang?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1730 km from Tuensang in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1480 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Tuensang
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- NERC Open Access Regulations, 2012; NERC regulations on Methodology for determination of Green Energy Open Access Charges, 30 September 2024; NERC tariff order dated 17 September 2026 (Table 10.3)
- NERC tariff order dated 17 September 2026, introduction item (d)
- PVGIS, European Commission Joint Research Centre (solar output model)