Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Tumkur, Karnataka as an EPC contractor: engineering, supply, construction and commissioning.
What Karnataka's policy says about large solar plants
The Karnataka Renewable Energy Policy 2022-2027 is the state's current policy for solar and other renewable projects. The Energy Department notified it on 16 April 2022. It is valid for five years or until a new policy is announced. No later policy was found.
Under KERC's Open Access Regulations, 2025 (26 March 2025), a consumer with a contract demand of 100 kW or more on HT, or a sanctioned load of 100 kW or more on LT, can take power through open access. The High Court of Karnataka struck down the Green Energy Open Access Regulations, 2022. The 2025 regulations replace the 2004 open access regulations.
The charges, exemptions and conditions for Karnataka are on the page Utility-Scale Solar in Karnataka.
Output and land at megawatt scale in Tumkur
A solar plant in Tumkur is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (18°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 70.5 lakh units | 20 to 25 acres |
| 10 MW | 1.41 crore units | 40 to 50 acres |
| 25 MW | 3.52 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Tumkur
These are the Somaya Solar projects closest to Tumkur, with straight-line distances. They are shown as references and are not in Tumkur unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1220 km from Tumkur. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1740 km from Tumkur. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Tumkur
Which electricity company handles solar connections in Tumkur?
Bangalore Electricity Supply Company Limited (BESCOM) supplies electricity in Tumakuru district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Tumkur?
About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Tumkur?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1700 km from Tumkur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1220 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Tumkur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BESCOM website, About Us
- GeoNames (place coordinates, CC BY 4.0)
- KERC (Terms and Conditions for Open Access) Regulations, 2025 (26 March 2025), KERC Combined Tariff Order 2025 (27 March 2025) and KERC order of 31 March 2026
- Karnataka Renewable Energy Policy 2022-2027, Energy Department notification of 16 April 2022 (Karnataka Gazette, 6 May 2022)
- PVGIS, European Commission Joint Research Centre (solar output model)