Somaya Solar Solutions Limited delivers turnkey solar projects in Tura, Meghalaya: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Tura

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (MePDCL) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Tura

In Meghalaya, net metering is open only to domestic, agricultural, group housing, charitable, government and local authority consumers. A commercial or industrial consumer can use net billing, gross metering or behind-the-meter. The rules are in MSERC's Grid Interactive Distributed Renewable Energy Sources (2 of 2026) Regulations, 2026, notified on 30 April 2026. They replaced the 2015 rooftop net metering regulations.

The size limits, charges and other conditions for Meghalaya are on the page Turnkey Solar EPC in Meghalaya.

In Tura the application for connection and metering goes to MePDCL.

What to expect from the plant in Tura

A solar plant in Tura is modelled to produce about 1,190 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial HT energy charge of ₹5.55 per kVAh (MSERC order in Case No. 11 of 2025 (MePDCL), dated 26 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹340 per kVA per month also applies. Time-of-day applies to HT industrial: 20% above the normal rate from 5 PM to 11 PM and 15% below it from 11 PM to 6 AM. Industries on EHT pay ₹6.60 per kVAh and ₹500 per kVA per month.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.55 per kVAh
100 kW1.2 lakh units1,000 sq m₹6.6 lakh
500 kW6.0 lakh units5,000 sq m₹33.0 lakh
1 MW11.9 lakh units10,000 sq m₹66.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Tura

These are the Somaya Solar projects closest to Tura, with straight-line distances. They are shown as references and are not in Tura unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1010 km from Tura. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1060 km from Tura. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1180 km from Tura. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Tura

Which electricity company handles solar connections in Tura?

Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies West Garo Hills district.

Is net metering available for factories and commercial buildings in Tura?

Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW. The rule is the same across Meghalaya.

How much electricity does a solar plant generate in Tura?

About 1,190 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.9 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Tura?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1310 km from Tura in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1010 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Tura

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image