Somaya Solar Solutions Limited builds ground-mounted solar power plants in Tura, Meghalaya for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Tura
A solar plant in Tura is modelled to produce about 1,260 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (31°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 1 MW | 12.6 lakh units | 4 to 5 acres |
| 2 MW | 25.2 lakh units | 8 to 10 acres |
| 5 MW | 63.0 lakh units | 20 to 25 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Meghalaya
The Meghalaya Power Policy, 2024 is the state's current power policy. It replaces the Power Policy 2007 and stays in force until 31 March 2030 unless notified otherwise. Its solar chapter covers projects that sell to the state, projects that sell outside the state and projects built by the state. It does not mention rooftop net metering.
Under Meghalaya's Green Energy Open Access Regulations, 2023 (notified on 9 May 2024), a consumer with a contracted demand or sanctioned load of 100 kW or more can take renewable power through open access. There is no limit on supply for captive consumers. At 11 kV the open access granted is from 100 kW to less than 2 MW, and at 33 kV from 2 MW to less than 5 MW.
The charges, exemptions and conditions for Meghalaya are on the page Ground-Mounted Solar Plant in Meghalaya.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar near Tura
These are the Somaya Solar projects closest to Tura, with straight-line distances. They are shown as references and are not in Tura unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1010 km from Tura. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1220 km from Tura. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Tura
Which electricity company handles solar connections in Tura?
Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies West Garo Hills district.
How much electricity does a solar plant generate in Tura?
About 1,260 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.6 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Tura?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1310 km from Tura in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1010 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Tura
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- MSERC (Terms and Conditions of Green Energy Open Access) Regulations, 2023 (notified 9 May 2024); MSERC tariff order of 26 March 2026 (cross-subsidy surcharge); MSERC Suo Motu Order No. 11 of 2026 of 9 October 2026 (additional surcharge); MSERC notice of 5 October 2026
- MSERC order, Case No. 11 of 2025 (MePDCL, FY 2026-27, 26 March 2026)
- Meghalaya Power Policy 2024 (Power Department, Government of Meghalaya), chapter VII and clauses 1 and 3
- PVGIS, European Commission Joint Research Centre (solar output model)