Somaya Solar Solutions Limited builds ground-mounted solar power plants in Meghalaya for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Meghalaya
Solar output changes across Meghalaya with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,210 to 1,260 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Jowai | 1,190 | 1,260 |
| Khliehriat | 1,200 | 1,260 |
| Nongstoin | 1,150 | 1,210 |
| Resubelpara | 1,160 | 1,220 |
| Shillong | 1,170 | 1,240 |
| Tura | 1,190 | 1,260 |
| Williamnagar | 1,150 | 1,220 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Meghalaya
The Meghalaya Power Policy, 2024 is the state's current power policy. It replaces the Power Policy 2007 and stays in force until 31 March 2030 unless notified otherwise. Its solar chapter covers projects that sell to the state, projects that sell outside the state and projects built by the state. It does not mention rooftop net metering.
- Target: at least 100 MW of solar by 2030. The state will also develop solar projects through the State Power Generating Company.
- Category I solar projects are set up in the state with a power purchase agreement with the state. Category II projects are set up in the state to sell power outside it.
- Solar projects under the policy are exempt from cross-subsidy surcharge and additional surcharge. Transmission and wheeling charges are waived in full for the first 2 years of commercial operation, and charged in full from the 7th year.
- Electricity duty is exempt on captive consumption, sale to the distribution licensee and third-party sale from solar projects set up in the state.
Under Meghalaya's Green Energy Open Access Regulations, 2023 (notified on 9 May 2024), a consumer with a contracted demand or sanctioned load of 100 kW or more can take renewable power through open access. There is no limit on supply for captive consumers. At 11 kV the open access granted is from 100 kW to less than 2 MW, and at 33 kV from 2 MW to less than 5 MW.
- Banked energy carries a charge of 8%, adjusted in kind. A banking cycle is 3 months from the start of banking, which the licensee may extend to no later than the end of the financial year. Unused banked energy lapses at the end of each cycle.
- Cross-subsidy surcharge for 2026-27 is ₹0.95 per kWh for HT consumers and ₹1.47 per kWh for EHT consumers. It is nil for Ferro Alloy industries.
- The provisional additional surcharge is ₹2.11 per unit for April to September 2026, and the same rate was continued provisionally for October 2026 to March 2027 by MSERC's order of 9 October 2026. It will be adjusted when MePDCL's actual data are examined.
- Cross-subsidy surcharge and additional surcharge are not levied on green power from a captive plant for the consumer's own use. Additional surcharge is also not applicable to a green energy open access consumer who pays fixed charges.
- The 2026-27 tariff order says an embedded HT or EHT consumer with a contract demand pays no separate transmission (STU) or wheeling charge for energy drawn through open access over the existing network.
- Standby charge is 125% of the normal tariff of the consumer category.
- The Commission approved procedures for medium-term and long-term green energy open access on 10 August 2026, with the State Transmission Utility as nodal agency.
- MSERC pre-published a draft Terms and Conditions of Open Access Regulations, 2026 on 5 October 2026 to replace the 2012 regulations. It is a draft; comments were due by 22 October 2026.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Meghalaya
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Meghalaya
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- MSERC (Terms and Conditions of Green Energy Open Access) Regulations, 2023 (notified 9 May 2024); MSERC tariff order of 26 March 2026 (cross-subsidy surcharge); MSERC Suo Motu Order No. 11 of 2026 of 9 October 2026 (additional surcharge); MSERC notice of 5 October 2026
- Meghalaya Power Policy 2024 (Power Department, Government of Meghalaya), chapter VII and clauses 1 and 3
- PVGIS, European Commission Joint Research Centre (solar output model)