Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Meghalaya as an EPC contractor: engineering, supply, construction and commissioning.

What Meghalaya's policy says about large solar plants

The Meghalaya Power Policy, 2024 is the state's current power policy. It replaces the Power Policy 2007 and stays in force until 31 March 2030 unless notified otherwise. Its solar chapter covers projects that sell to the state, projects that sell outside the state and projects built by the state. It does not mention rooftop net metering.

  • Target: at least 100 MW of solar by 2030. The state will also develop solar projects through the State Power Generating Company.
  • Category I solar projects are set up in the state with a power purchase agreement with the state. Category II projects are set up in the state to sell power outside it.
  • Solar projects under the policy are exempt from cross-subsidy surcharge and additional surcharge. Transmission and wheeling charges are waived in full for the first 2 years of commercial operation, and charged in full from the 7th year.
  • Electricity duty is exempt on captive consumption, sale to the distribution licensee and third-party sale from solar projects set up in the state.

Under Meghalaya's Green Energy Open Access Regulations, 2023 (notified on 9 May 2024), a consumer with a contracted demand or sanctioned load of 100 kW or more can take renewable power through open access. There is no limit on supply for captive consumers. At 11 kV the open access granted is from 100 kW to less than 2 MW, and at 33 kV from 2 MW to less than 5 MW.

  • Banked energy carries a charge of 8%, adjusted in kind. A banking cycle is 3 months from the start of banking, which the licensee may extend to no later than the end of the financial year. Unused banked energy lapses at the end of each cycle.
  • Cross-subsidy surcharge for 2026-27 is ₹0.95 per kWh for HT consumers and ₹1.47 per kWh for EHT consumers. It is nil for Ferro Alloy industries.
  • The provisional additional surcharge is ₹2.11 per unit for April to September 2026, and the same rate was continued provisionally for October 2026 to March 2027 by MSERC's order of 9 October 2026. It will be adjusted when MePDCL's actual data are examined.
  • Cross-subsidy surcharge and additional surcharge are not levied on green power from a captive plant for the consumer's own use. Additional surcharge is also not applicable to a green energy open access consumer who pays fixed charges.
  • The 2026-27 tariff order says an embedded HT or EHT consumer with a contract demand pays no separate transmission (STU) or wheeling charge for energy drawn through open access over the existing network.
  • Standby charge is 125% of the normal tariff of the consumer category.
  • The Commission approved procedures for medium-term and long-term green energy open access on 10 August 2026, with the State Transmission Utility as nodal agency.
  • MSERC pre-published a draft Terms and Conditions of Open Access Regulations, 2026 on 5 October 2026 to replace the 2012 regulations. It is a draft; comments were due by 22 October 2026.

Output and land at megawatt scale in Meghalaya

Solar output changes across Meghalaya with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,210 to 1,260 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Jowai1,1901,260
Khliehriat1,2001,260
Nongstoin1,1501,210
Resubelpara1,1601,220
Shillong1,1701,240
Tura1,1901,260
Williamnagar1,1501,220

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What utility-scale work involves

At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.

  • Land and grid-connection feasibility
  • Detailed engineering for the plant and the evacuation system
  • Procurement and logistics for modules, inverters, transformers and structures
  • Civil, mechanical and electrical construction with several teams working in parallel
  • Testing, commissioning and connection with the transmission or distribution utility
  • Operation and maintenance, where contracted

More detail: Utility-Scale Solar across India.

Questions about solar projects in Meghalaya

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Meghalaya

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.