Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Varanasi, Uttar Pradesh.
Varanasi at a glance for solar projects
| District and state | Varanasi district, Uttar Pradesh |
|---|---|
| Electricity supply | Purvanchal Vidyut Vitran Nigam Limited (PuVVNL), the state distribution company with its head office in Varanasi, supplies electricity in Varanasi district. Varanasi is one of the 21 districts PuVVNL lists as its area. |
| Electricity regulator | Uttar Pradesh Electricity Regulatory Commission (UPERC) |
| State renewable energy agency | Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) |
| State solar policy | Uttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier) |
| Rooftop metering for businesses | Net billing or gross metering; no net metering for industry or commerce |
| Modelled solar output | about 1,370 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 660 km from Varanasi in a straight line |
Solar services in Varanasi
- Solar EPC Company in Varanasi
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Varanasi
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Varanasi
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Varanasi
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Varanasi
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Varanasi
One contract from survey to a working plant, with approvals and handover included.
Varanasi: industrial areas and district products
The MSME Development Institute's industrial profile of Varanasi district (2014) lists an agro park at Karkhiyaon.
Under the state's One District One Product scheme, the products listed for Varanasi district are Silk Products, Wooden Toys and Gulabi Meenakari.
The Government of India's One District One Product (ODOP) list names Silk Products, Pink Enamel (Gulaabi Minakari), Wooden Lacquer Ware and Toys as the products of Varanasi district.
Solar output in Varanasi
A solar plant in Varanasi is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.10 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.7 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹48.6 lakh |
| 1 MW | 13.7 lakh units | 10,000 sq m | ₹97.3 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Varanasi
For a rooftop array in Varanasi the strongest month is April, at about 143 units for each kW installed, and the weakest is July, at about 87. For a ground-mounted array at a 30° tilt the strongest month is March (about 148) and the weakest is July (about 79). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 112 | 137 |
| February | 118 | 135 |
| March | 141 | 148 |
| April | 143 | 138 |
| May | 143 | 129 |
| June | 113 | 100 |
| July | 87 | 79 |
| August | 90 | 86 |
| September | 96 | 97 |
| October | 113 | 125 |
| November | 109 | 131 |
| December | 109 | 136 |
Somaya Solar projects near Varanasi
These are the Somaya Solar projects closest to Varanasi, with straight-line distances. They are shown as references and are not in Varanasi unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 310 km from Varanasi. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 420 km from Varanasi. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 590 km from Varanasi. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Varanasi
Which electricity company handles solar connections in Varanasi?
Purvanchal Vidyut Vitran Nigam Limited (PuVVNL), the state distribution company with its head office in Varanasi, supplies electricity in Varanasi district. Varanasi is one of the 21 districts PuVVNL lists as its area.
Is net metering available for factories and commercial buildings in Varanasi?
Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.
How much electricity does a solar plant generate in Varanasi?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Varanasi?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 660 km from Varanasi in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 310 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Varanasi
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- Government of Uttar Pradesh e-Nagarsewa portal: list of Nagar Nigams (municipal corporations) with their districts
- MSME-Development Institute (Branch), Varanasi (Ministry of MSME, Govt. of India), Brief Industrial Profile of Varanasi District (updated), section 2.1 (PDF created 2014-07-17)
- ODOP portal, Government of Uttar Pradesh: Varanasi district page
- PVGIS, European Commission Joint Research Centre (solar output model)
- PuVVNL website: Profile (districts covered)
- UPERC (Rooftop Solar PV Grid Interactive Systems Gross/Net Metering) Regulations, 2019, with amendments of 1 June 2022, 17 November 2023 and 3 June 2025; UPERC tariff order of 2 July 2026, paragraph 3.13.5
- UPERC tariff order for 2026-27 for the state distribution companies, dated 2 July 2026
- Uttar Pradesh Electricity Regulatory Commission
- Uttar Pradesh Solar Energy Policy 2022 (Government of Uttar Pradesh)