Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Vizianagaram, Andhra Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Vizianagaram at a glance for solar projects

District and stateVizianagaram district, Andhra Pradesh
Electricity supplyAndhra Pradesh Eastern Power Distribution Company Limited (APEPDCL) supplies electricity in Vizianagaram district, one of the districts it lists as its area.
Electricity regulatorAndhra Pradesh Electricity Regulatory Commission (APERC)
State renewable energy agencyNew & Renewable Energy Development Corporation of Andhra Pradesh Limited (NREDCAP)
State solar policyAndhra Pradesh Integrated Clean Energy Policy, 2024 (G.O.Ms.No.37, 30 October 2024)
Rooftop metering for businessesNet metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand
Modelled solar outputabout 1,360 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1320 km from Vizianagaram in a straight line

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Vizianagaram

These are the rooftop limits as APERC finalised them in its order of 22 February 2024 on the Grid Interactive Solar Rooftop Photovoltaic System (Gross/Net Metering) Regulation, 2023. Check later amendments with the distribution company before relying on them.

The size limits, charges and other conditions for Andhra Pradesh are on the page Solar EPC Company in Andhra Pradesh.

In Vizianagaram the application for connection and metering goes to APEPDCL.

What a plant produces in Vizianagaram

A solar plant in Vizianagaram is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (General), HT-III(A), 11 kV supply energy charge of ₹6.30 per kVAh (APERC retail supply tariff order for FY 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is for normal hours (3 PM to 6 PM and 10 PM to midnight). The table shows the billing unit as kWh/kVAh. Time-of-day rates apply: in 11 kV supply, off-peak (10 AM to 3 PM and midnight to 6 AM) is ₹5.55. Peak (6 AM to 10 AM and 6 PM to 10 PM) is ₹7.80 in the high-demand months (April and May, September and October, February and March) and ₹7.30 in the other months. Normal-hour rates at other voltages: ₹5.85 at 33 kV, ₹5.40 at 132 kV and ₹5.35 at 220 kV. A demand charge of ₹475 per kVA per month also applies. The tariff excludes electricity duty, fuel and power purchase cost adjustment (FPPCA), true-up and other recoveries. The same schedule applies to APSPDCL, APCPDCL and APEPDCL.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.30 per kVAh
100 kW1.4 lakh units1,000 sq m₹8.6 lakh
500 kW6.8 lakh units5,000 sq m₹42.8 lakh
1 MW13.6 lakh units10,000 sq m₹85.7 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Vizianagaram: industrial areas

APIIC, the Andhra Pradesh Industrial Infrastructure Corporation, lists Ip_Vizianagaram among its industrial areas in Vizianagaram district.

The Government of India's One District One Product (ODOP) list names Mango Jelly, Bobilli Veena and Design Bedsheets as the products of Vizianagaram district.

EPC projects by Somaya Solar near Vizianagaram

These are the Somaya Solar projects closest to Vizianagaram, with straight-line distances. They are shown as references and are not in Vizianagaram unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 710 km from Vizianagaram. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1140 km from Vizianagaram. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1300 km from Vizianagaram. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Vizianagaram

Which electricity company handles solar connections in Vizianagaram?

Andhra Pradesh Eastern Power Distribution Company Limited (APEPDCL) supplies electricity in Vizianagaram district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Vizianagaram?

Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand. The rule is the same across Andhra Pradesh.

How much electricity does a solar plant generate in Vizianagaram?

About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Vizianagaram?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1320 km from Vizianagaram in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 710 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Vizianagaram

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image