Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Andhra Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Andhra Pradesh at a glance for solar projects
| Electricity regulator | Andhra Pradesh Electricity Regulatory Commission (APERC) |
|---|---|
| State renewable energy agency | New & Renewable Energy Development Corporation of Andhra Pradesh Limited (NREDCAP) |
| Electricity distribution | APSPDCL (Nine districts in the south and the Rayalaseema: SPSR Nellore, Tirupati, Chittoor, Annamayya, YSR Kadapa, Nandyal, Kurnool, Ananthapuramu and Sri Sathya Sai. Head office in Tirupati.); APCPDCL (NTR, Krishna, Guntur, Palnadu, Bapatla, Prakasam and Markapuram districts, plus eight mandals of Eluru district: Kaikaluru, Kalidindi, Mandavalli, Mudinepalli, Agiripalli, Chatrai, Musunuru and Nuzvidu. Head office in Vijayawada.); APEPDCL (The north-east coast: Srikakulam, Vizianagaram, Parvathipuram Manyam, Visakhapatnam, Anakapalli, Alluri Sitharamaraju, Kakinada, East Godavari, Dr B.R. Ambedkar Konaseema, West Godavari and Eluru districts (the eight Eluru mandals above are APCPDCL). Head office in Visakhapatnam.) |
| State solar policy | Andhra Pradesh Integrated Clean Energy Policy, 2024 (G.O.Ms.No.37, 30 October 2024) |
| Rooftop metering for businesses | Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Andhra Pradesh
These are the rooftop limits as APERC finalised them in its order of 22 February 2024 on the Grid Interactive Solar Rooftop Photovoltaic System (Gross/Net Metering) Regulation, 2023. Check later amendments with the distribution company before relying on them.
- Net metering: up to 500 kWp, or the contracted demand if that is lower.
- Net billing or net feed-in: up to 1,000 kWp, or the contracted demand if that is lower.
- Gross metering: up to 5,000 kWp, or the contracted demand if that is lower. Larger plants can be set up as captive plants under section 9 of the Electricity Act, 2003.
- Group net metering and virtual net metering are allowed from 5 kWp to 500 kWp.
- Plant capacity is counted in DC (kWp), not inverter capacity.
- The total rooftop capacity on one distribution transformer may not exceed 80% of its rated capacity, and 100% of the feeder capacity.
What a plant produces in Andhra Pradesh
Solar output changes across Andhra Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,310 to 1,400 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Anantapur | 1,400 | 1,420 |
| Guntur | 1,330 | 1,340 |
| Kadapa | 1,360 | 1,370 |
| Kakinada | 1,370 | 1,390 |
| Kurnool | 1,360 | 1,380 |
| Nandyal | 1,340 | 1,360 |
| Nellore | 1,370 | 1,370 |
| Ongole | 1,370 | 1,380 |
| Rajamahendravaram | 1,330 | 1,350 |
| Tirupati | 1,350 | 1,350 |
| Vijayawada | 1,310 | 1,320 |
| Visakhapatnam | 1,380 | 1,400 |
| Vizianagaram | 1,360 | 1,380 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Andhra Pradesh
Is net metering available for factories and commercial buildings in Andhra Pradesh?
These are the rooftop limits as APERC finalised them in its order of 22 February 2024 on the Grid Interactive Solar Rooftop Photovoltaic System (Gross/Net Metering) Regulation, 2023. Check later amendments with the distribution company before relying on them.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Andhra Pradesh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APERC final order dated 22 February 2024 on the APERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulation, 2023 (Regulation 4 of 2023)
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026
- APSPDCL recruitment notification of 24 June 2026 (district list); APCPDCL recruitment notification of 25 June 2026 (district list and Eluru mandals); APEPDCL website contacts menu (https://www.apeasternpower.com/districtMap); APERC tariff order for FY 2026-27, dated 25 March 2026 (names the three licensees)
- G.O.Ms.No.26, Energy (Power-II) Department, 28 February 2025, operational guidelines for the Andhra Pradesh Integrated Clean Energy Policy, 2024
- PVGIS, European Commission Joint Research Centre (solar output model)