Somaya Solar Solutions Limited builds ground-mounted solar power plants in Andhra Pradesh for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Andhra Pradesh
Solar output changes across Andhra Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,320 to 1,420 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Anantapur | 1,400 | 1,420 |
| Guntur | 1,330 | 1,340 |
| Kadapa | 1,360 | 1,370 |
| Kakinada | 1,370 | 1,390 |
| Kurnool | 1,360 | 1,380 |
| Nandyal | 1,340 | 1,360 |
| Nellore | 1,370 | 1,370 |
| Ongole | 1,370 | 1,380 |
| Rajamahendravaram | 1,330 | 1,350 |
| Tirupati | 1,350 | 1,350 |
| Vijayawada | 1,310 | 1,320 |
| Visakhapatnam | 1,380 | 1,400 |
| Vizianagaram | 1,360 | 1,380 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Andhra Pradesh
The Andhra Pradesh Integrated Clean Energy Policy, 2024 is the state's policy for solar, wind, storage and other clean energy projects. The Energy Department issued it on 30 October 2024 and approved operational guidelines for it on 28 February 2025. The policy text itself and its period of validity were not read from an official copy.
- NREDCAP is the nodal agency for granting approvals, allocating resources and implementing projects under the policy.
- NREDCAP approves solar projects of up to 40 MWp. Larger solar projects go to the State Investment Promotion Committee, the State Investment Promotion Board and the state government.
- Developers can use open access under the APERC Green Energy Open Access, Charges and Banking Regulation, 2024 (Regulation No. 3 of 2024). Energy banking runs on a monthly billing cycle.
- For open access for captive use, the plant must show that captive users hold at least 26% of its ownership and that at least 51% of the energy generated in a year is used for captive use.
Open access for green energy in Andhra Pradesh follows APERC's Green Energy Open Access, Charges and Banking Regulation, 2024 (Regulation No. 3 of 2024). That regulation was not read, so its minimum load, captive limits and banking charge are not given here. The tariff order for 2026-27 sets the cross-subsidy surcharge.
- Cross-subsidy surcharge for HT industry in 2026-27 at 11 kV: ₹1.89 per unit in the APSPDCL area, ₹1.85 in the APCPDCL area and ₹1.71 in the APEPDCL area.
- Cross-subsidy surcharge for HT industry in 2026-27 at 33 kV: ₹1.54 per unit in the APSPDCL area, ₹1.55 in the APCPDCL area and ₹1.48 in the APEPDCL area.
- The distribution companies did not propose an additional surcharge for 2026-27, so the order does not set one.
- Application fee for green energy open access: ₹1,50,000 for long-term, ₹1,00,000 for medium-term and ₹50,000 for short-term.
- Energy banking runs on a monthly billing cycle. The state caps banking at grid level at 5% of peak grid demand, set at 700 MW for 2024-25.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Andhra Pradesh
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Andhra Pradesh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026 (Chapter XII); G.O.Ms.No.26, Energy (Power-II) Department, 28 February 2025 (sections 9 and 10)
- G.O.Ms.No.26, Energy (Power-II) Department, 28 February 2025, operational guidelines for the Andhra Pradesh Integrated Clean Energy Policy, 2024
- PVGIS, European Commission Joint Research Centre (solar output model)