Commercial and Industrial Rooftop Solar in Agra

Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Agra, Uttar Pradesh. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Agra: industrial areas, industry and the Taj Trapezium Zone

The district administration lists industrial areas at Foundry Nagar, Nunhai, Sikandra (Sites A, B and C) and Achnera.

By the district administration's figures, Agra has about 7,200 small-scale units and 12 large and medium units, and makes more than 1.5 lakh pairs of shoes a day. A rooftop plant generates in the daytime, so it suits units whose load runs through the day.

Agra is in the Taj Trapezium Zone, the area around the Taj Mahal where the Supreme Court has controlled industrial pollution. Its judgment of 30 December 1996 told 292 industries in the zone to change over to natural gas or stop running on coke and coal. The judgment is about fuel burned by industry and does not deal with solar plants. A solar plant burns no fuel on site.

The Government of India's One District One Product (ODOP) list names Leather Products and Handicrafts- Stone & Marble as the products of Agra district.

Metering rules for business rooftops in Agra

In Uttar Pradesh, commercial and industrial consumers do not get net metering. Under the regulator's rooftop solar regulations of 2019, as amended, they can use net billing (also called net feed-in) or gross metering. Net metering is kept for domestic and metered agricultural consumers and, since November 2023, for public and educational institutions.

The size limits, charges and other conditions for Uttar Pradesh are on the page Commercial & Industrial Solar in Uttar Pradesh.

Agra city's supply is run by Torrent Power, so that is the company to ask first about connecting a rooftop plant in the city. The licence stays with DVVNL. Ask for the current steps before you apply, because the process for a commercial or industrial connection can change.

Output and bill value for a rooftop plant in Agra

A solar plant in Agra is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.10 per kVAh
100 kW1.4 lakh units1,000 sq m₹10.0 lakh
250 kW3.5 lakh units2,500 sq m₹25.0 lakh
500 kW7.0 lakh units5,000 sq m₹50.1 lakh
1 MW14.1 lakh units10,000 sq m₹1.00 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Agra

These are the Somaya Solar projects closest to Agra, with straight-line distances. They are shown as references and are not in Agra unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 200 km from Agra. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 240 km from Agra. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 310 km from Agra. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Agra

Which electricity company handles solar connections in Agra?

Torrent Power Limited supplies Agra city as the distribution franchisee of Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL). Torrent Power has run the city's supply since 1 April 2010. DVVNL holds the licence, has its head office in Agra and supplies the places outside the franchise area itself.

Is net metering available for factories and commercial buildings in Agra?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much electricity does a solar plant generate in Agra?

About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Agra?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 170 km from Agra in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 200 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Agra

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.