Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Agra, Uttar Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Agra at a glance for solar projects
| District and state | Agra district (Agra division), Uttar Pradesh |
|---|---|
| Electricity supply | Torrent Power Limited supplies Agra city as the distribution franchisee of Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL). Torrent Power has run the city's supply since 1 April 2010. DVVNL holds the licence, has its head office in Agra and supplies the places outside the franchise area itself. |
| Electricity regulator | Uttar Pradesh Electricity Regulatory Commission (UPERC) |
| State renewable energy agency | Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) |
| State solar policy | Uttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier) |
| Rooftop metering for businesses | Net billing or gross metering; no net metering for industry or commerce |
| Modelled solar output | about 1,410 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 170 km from Agra in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Agra
In Uttar Pradesh, commercial and industrial consumers do not get net metering. Under the regulator's rooftop solar regulations of 2019, as amended, they can use net billing (also called net feed-in) or gross metering. Net metering is kept for domestic and metered agricultural consumers and, since November 2023, for public and educational institutions.
The size limits, charges and other conditions for Uttar Pradesh are on the page Solar EPC Company in Uttar Pradesh.
Agra city's supply is run by Torrent Power, so that is the company to ask first about connecting a rooftop plant in the city. The licence stays with DVVNL. Ask for the current steps before you apply, because the process for a commercial or industrial connection can change.
What a plant produces in Agra
A solar plant in Agra is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.10 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹10.0 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹50.1 lakh |
| 1 MW | 14.1 lakh units | 10,000 sq m | ₹1.00 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Agra: industrial areas, industry and the Taj Trapezium Zone
The district administration lists industrial areas at Foundry Nagar, Nunhai, Sikandra (Sites A, B and C) and Achnera.
By the district administration's figures, Agra has about 7,200 small-scale units and 12 large and medium units, and makes more than 1.5 lakh pairs of shoes a day. A rooftop plant generates in the daytime, so it suits units whose load runs through the day.
Agra is in the Taj Trapezium Zone, the area around the Taj Mahal where the Supreme Court has controlled industrial pollution. Its judgment of 30 December 1996 told 292 industries in the zone to change over to natural gas or stop running on coke and coal. The judgment is about fuel burned by industry and does not deal with solar plants. A solar plant burns no fuel on site.
The Government of India's One District One Product (ODOP) list names Leather Products and Handicrafts- Stone & Marble as the products of Agra district.
EPC projects by Somaya Solar near Agra
These are the Somaya Solar projects closest to Agra, with straight-line distances. They are shown as references and are not in Agra unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 200 km from Agra. In progress. Site access was difficult and was handled with local support.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 200 km from Agra. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 240 km from Agra. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Agra
Which electricity company handles solar connections in Agra?
Torrent Power Limited supplies Agra city as the distribution franchisee of Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL). Torrent Power has run the city's supply since 1 April 2010. DVVNL holds the licence, has its head office in Agra and supplies the places outside the franchise area itself.
Is net metering available for factories and commercial buildings in Agra?
Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.
How much electricity does a solar plant generate in Agra?
About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Agra?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 170 km from Agra in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 200 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Agra
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Agra district administration: Economy (agra.nic.in, updated 9 September 2026)
- Agra district administration: administrative setup (agra.nic.in)
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Supreme Court of India, M.C. Mehta v. Union of India, judgment of 30 December 1996 (Taj Trapezium case)
- UPERC (Rooftop Solar PV Grid Interactive Systems Gross/Net Metering) Regulations, 2019, with amendments of 1 June 2022, 17 November 2023 and 3 June 2025; UPERC tariff order of 2 July 2026, paragraph 3.13.5
- UPERC tariff order for 2026-27 for the state distribution companies, dated 2 July 2026
- UPERC tariff order for 2026-27, dated 2 July 2026 (section 3.8, Agra distribution franchisee), and Torrent Power company milestones
- Uttar Pradesh Electricity Regulatory Commission
- Uttar Pradesh Solar Energy Policy 2022 (Government of Uttar Pradesh)