Solar EPC Company in Uttar Pradesh

Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Uttar Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Uttar Pradesh at a glance for solar projects

Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
Electricity distributionDVVNL (head office in Agra); Torrent Power (distribution franchisee of DVVNL for Agra); MVVNL (head office in Lucknow); PVVNL (head office in Meerut); PuVVNL (head office in Varanasi); KESCO (Kanpur); NPCL (private licensee for Greater Noida)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Uttar Pradesh

In Uttar Pradesh, commercial and industrial consumers do not get net metering. Under the regulator's rooftop solar regulations of 2019, as amended, they can use net billing (also called net feed-in) or gross metering. Net metering is kept for domestic and metered agricultural consumers and, since November 2023, for public and educational institutions.

  • Under net billing, the electricity you draw from the grid is billed at your normal tariff, and the solar power you send to the grid is credited at a separate export rate. Under the amendment of 3 June 2025, that rate is the weighted average tariff of large solar projects (5 MW and above) found through competitive bidding in the previous financial year and adopted by the regulator, plus 25%. If there was no such bidding, the last rate continues. Ask the distribution company for the rupee figure in force.
  • Most of the saving therefore comes from solar power used inside the premises as it is generated. Size the plant to the daytime load.
  • A rooftop plant may not be larger than 100% of the consumer's connected load or contracted demand. Under these regulations it must be between 1 kW and 2 MW.
  • The total rooftop capacity on one distribution transformer may not exceed 75% of that transformer's capacity.
  • A check meter is mandatory for a plant above 50 kW.

What a plant produces in Uttar Pradesh

Solar output changes across Uttar Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,320 to 1,420 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Afzalgarh1,3701,460
Agra1,4101,490
Ahraura1,3701,440
Akbarpur1,3801,450
Aliganj1,4101,490
Aligarh1,4201,500
Amroha1,4101,500
Anupshahr1,4101,500
Aonla1,4101,500
Atarra1,3801,450
Atrauli1,4101,500
Auraiya1,4001,480
Awagarh1,4201,500
Ayodhya1,3801,460
Azamgarh1,3801,450
Bachhraon1,4101,500
Baghpat1,4201,510
Baheri1,3901,480
Bahjoi1,4101,500
Bahraich1,3901,470
Ballia1,3701,440
Balrampur1,3801,470
Banat1,4101,510
Banda1,3801,450
Bangarmau1,4001,480
Bansdih1,3701,440
Bansi1,3701,450
Barabanki1,3901,470
Baraut1,4101,510
Bareilly1,4001,490
Basti1,3701,450
Bela1,3801,460
Bewar1,4101,490
Bhadohi1,3801,440
Bharthana1,4001,480
Bhinga1,3901,470
Bhongaon1,4101,490
Bidhuna1,4001,480
Bijnor1,3901,490
Bilari1,4101,500
Bilgram1,4001,480
Bilsi1,4101,500
Bindki1,3901,470
Bisalpur1,3901,470
Bisauli1,4101,500
Biswan1,3901,480
Budaun1,4101,500
Budhana1,4101,500
Bulandshahr1,4101,500
Chandauli1,3701,440
Chandausi1,4101,500
Chandpur1,4001,490
Charkhari1,3901,460
Chharra1,4201,500
Chhata1,4201,500
Chhibramau1,4101,490
Chitrakoot Dham1,3801,450
Chunar1,3701,440
Colonelganj1,3901,470
Dadri1,4101,500
Dasna1,4101,510
Dataganj1,4001,490
Deoband1,4001,500
Deoria1,3601,440
Dhampur1,3701,470
Dhanaura1,4101,500
Dhaurahra1,3801,470
Dibai1,4101,500
Etah1,4101,500
Etawah1,4001,480
Etmadpur1,4101,490
Faridpur1,4001,490
Farrukhabad1,4001,490
Fatehabad1,4101,490
Fatehganj West1,4001,490
Fatehgarh1,4001,490
Fatehpur1,3901,470
Fatehpur Sikri1,4201,490
Firozabad1,4101,490
Fyzabad1,3801,460
Gajraula1,4101,500
Gangoh1,4001,500
Ganj Dundwara1,4101,500
Garhmuktesar1,4101,500
Gauriganj1,3901,460
Ghatampur1,4001,470
Ghaziabad1,4201,510
Ghazipur1,3701,440
Ghosi1,3701,450
Gola Gokarannath1,3901,470
Gonda1,3901,470
Gorakhpur1,3601,440
Govardhan1,4201,500
Greater Noida1,4201,510
Gulaothi1,4101,500
Gunnaur1,4201,500
Gursahaiganj1,4101,490
Gursarai1,4001,470
Hamirpur1,3901,470
Hapur1,4101,500
Hardoi1,4001,480
Hasanpur1,4101,510
Hastinapur1,4001,490
Hathras1,4201,500
Islamnagar1,4101,500
Jagdishpur1,4001,480
Jahangirabad1,4101,500
Jais1,3801,460
Jalalabad1,4001,490
Jalalpur1,3801,450
Jalaun1,4001,470
Jalesar1,4201,500
Jaswantnagar1,4001,480
Jaunpur1,3801,450
Jhalu1,3901,490
Jhansi1,4001,470
Jhinjhak1,4001,480
Kabrai1,3901,450
Kaimganj1,4101,490
Kairana1,4201,510
Kakrala1,4101,500
Kalpi1,4001,470
Kandhla1,4101,510
Kannauj1,4001,480
Kanpur1,4001,470
Kant1,4001,480
Kanth1,3901,490
Karhal1,4101,490
Kasganj1,4101,500
Kemri1,4001,490
Khair1,4201,510
Khairabad1,3901,470
Khairagarh1,4101,490
Khalilabad1,3701,440
Khatauli1,4001,500
Khekra1,4201,510
Kheri1,3801,470
Khurja1,4101,500
Kiraoli1,4101,490
Kiratpur1,3801,470
Kithor1,4101,500
Konch1,4001,470
Kopaganj1,3701,440
Kosi1,4201,500
Kunda1,3901,450
Kundarkhi1,4101,500
Kushinagar1,3601,440
Laharpur1,3901,470
Lakhimpur1,3801,470
Lalganj1,3901,460
Lalitpur1,3901,450
Lar1,3701,450
Loni1,4101,500
Lucknow1,3901,470
Machhlishahr1,3801,450
Maharaganj1,3401,420
Mahmudabad1,3901,470
Mahoba1,3901,460
Mainpuri1,4101,490
Mandawar1,3901,490
Maniar1,3701,440
Mariahu1,3801,450
Mathura1,4201,500
Mau Aimma1,3801,450
Maudaha1,3901,460
Maunath1,3801,450
Mawana1,4001,500
Meerut1,4101,510
Mehndawal1,3701,450
Milak1,4001,490
Miranpur1,4001,490
Mirzapur1,3801,440
Modinagar1,4101,500
Moradabad1,4001,490
Mubarakpur1,3801,450
Muhammadabad1,3701,440
Muradnagar1,4201,510
Muzaffarnagar1,4001,500
Nagina1,3801,470
Najibabad1,3601,460
Nakur1,4001,500
Nanpara1,3701,460
Naraura1,4101,500
Nautanwa1,3201,400
Nawabganj1,3901,470
Nihtaur1,3801,480
Noida1,4201,510
Nurpur1,4001,490
Obra1,3801,440
Orai1,4001,470
Padrauna1,3501,430
Palia Kalan1,3601,450
Pandit Deen Dayal Upadhyaya Nagar1,3701,440
Pawayan1,3901,480
Phulpur1,3801,450
Pihani1,4001,480
Pilibhit1,3701,460
Pilkhuwa1,4101,510
Prayagraj1,3801,450
Pukhrayan1,4001,470
Puranpur1,3601,450
Purwa1,3901,470
Raebareli1,3901,470
Rampur1,4001,500
Rasra1,3701,440
Rath1,3901,460
Raya1,4201,500
Renukoot1,3801,440
Reoti1,3701,430
Robertsganj1,3801,450
Rudarpur1,3701,450
Sadabad1,4201,500
Safipur1,4001,480
Saharanpur1,4001,490
Sahaspur1,3901,490
Sahaswan1,4101,500
Sahawar1,4101,490
Saidpur1,3801,440
Sambhal1,4101,500
Samthar1,4001,470
Sandi1,4001,480
Sandila1,3901,470
Sardhana1,4101,500
Seohara1,3901,480
Shahganj1,3801,450
Shahjahanpur1,4001,480
Shamli1,4101,510
Shamsabad1,4101,490
Sherkot1,3701,470
Shikarpur1,4101,500
Shikohabad1,4101,490
Shishgarh1,3901,490
Sidhauli1,3901,470
Sikandra Rao1,4201,500
Sikandrabad1,4201,510
Sirsaganj1,4101,490
Sirsi1,4101,500
Sitapur1,3901,480
Soron1,4101,500
Suar1,3801,480
Sultanpur1,3801,450
Tanda1,4001,490
Thakurdwara1,3901,490
Thana Bhawan1,4101,500
Tilhar1,4001,490
Tulsipur1,3701,450
Tundla1,4101,490
Ujhani1,4101,500
Unnao1,4001,470
Utraula1,3801,460
Varanasi1,3701,440
Vrindavan1,4201,500
Zaidpur1,3901,470
Zamania1,3701,440

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

EPC projects by Somaya Solar in Uttar Pradesh

Somaya Solar's published projects in Uttar Pradesh:

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Uttar Pradesh

Is net metering available for factories and commercial buildings in Uttar Pradesh?

In Uttar Pradesh, commercial and industrial consumers do not get net metering. Under the regulator's rooftop solar regulations of 2019, as amended, they can use net billing (also called net feed-in) or gross metering. Net metering is kept for domestic and metered agricultural consumers and, since November 2023, for public and educational institutions.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh. Its published projects in Uttar Pradesh are: KRIBHCO (2 MW rooftop plant, Shahjahanpur); KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha).

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Uttar Pradesh

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.