Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Kithor, Uttar Pradesh.

Kithor at a glance for solar projects

District and stateMeerut district, Uttar Pradesh
Electricity supplyPashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies electricity in Meerut district, one of the districts it lists as its area.
Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce
Modelled solar outputabout 1,410 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 50 km from Kithor in a straight line

Solar services in Kithor

Local points for solar projects in Kithor

The Government of India's One District One Product (ODOP) list names Sports Goods as the product of Meerut district.

Solar output in Kithor

A solar plant in Kithor is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.10 per kVAh
100 kW1.4 lakh units1,000 sq m₹10.0 lakh
500 kW7.0 lakh units5,000 sq m₹50.1 lakh
1 MW14.1 lakh units10,000 sq m₹1.00 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Kithor

For a rooftop array in Kithor the strongest month is May, at about 147 units for each kW installed, and the weakest is July, at about 98. For a ground-mounted array at a 32° tilt the strongest month is March (about 148) and the weakest is July (about 89). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January105134
February111131
March138148
April144141
May147133
June127112
July9889
August9893
September106109
October122140
November108135
December104137

Somaya Solar projects near Kithor

These are the Somaya Solar projects closest to Kithor, with straight-line distances. They are shown as references and are not in Kithor unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 50 km from Kithor. In progress. Site access was difficult and was handled with local support.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 110 km from Kithor. Completed in two months, with five years of operation and maintenance.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 120 km from Kithor. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.

See all published projects

Questions about solar projects in Kithor

Which electricity company handles solar connections in Kithor?

Pashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies electricity in Meerut district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Kithor?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much electricity does a solar plant generate in Kithor?

About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Kithor?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 50 km from Kithor in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 50 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Kithor

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image