Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Garhmuktesar, Uttar Pradesh.

Garhmuktesar at a glance for solar projects

District and stateHapur district, Uttar Pradesh
Electricity supplyPashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies electricity in Hapur district, one of the districts it lists as its area.
Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce
Modelled solar outputabout 1,410 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 70 km from Garhmuktesar in a straight line

Solar services in Garhmuktesar

Local points for solar projects in Garhmuktesar

The Government of India's One District One Product (ODOP) list names Home Decorative Goods as the product of Hapur district.

Solar output in Garhmuktesar

A solar plant in Garhmuktesar is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.10 per kVAh
100 kW1.4 lakh units1,000 sq m₹10.0 lakh
500 kW7.0 lakh units5,000 sq m₹50.1 lakh
1 MW14.1 lakh units10,000 sq m₹1.00 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Garhmuktesar

For a rooftop array in Garhmuktesar the strongest month is May, at about 147 units for each kW installed, and the weakest is July, at about 97. For a ground-mounted array at a 32° tilt the strongest month is March (about 148) and the weakest is July (about 88). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January105134
February111130
March138148
April144140
May147133
June127111
July9788
August9893
September106109
October122140
November108135
December104136

Somaya Solar projects near Garhmuktesar

These are the Somaya Solar projects closest to Garhmuktesar, with straight-line distances. They are shown as references and are not in Garhmuktesar unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 40 km from Garhmuktesar. In progress. Site access was difficult and was handled with local support.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 100 km from Garhmuktesar. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 130 km from Garhmuktesar. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Garhmuktesar

Which electricity company handles solar connections in Garhmuktesar?

Pashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies electricity in Hapur district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Garhmuktesar?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much electricity does a solar plant generate in Garhmuktesar?

About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Garhmuktesar?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 70 km from Garhmuktesar in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 40 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Garhmuktesar

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.