Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Gorakhpur, Uttar Pradesh.

Gorakhpur at a glance for solar projects

District and stateGorakhpur district, Uttar Pradesh
Electricity supplyPurvanchal Vidyut Vitran Nigam Limited (PuVVNL), the state distribution company with its head office in Varanasi, supplies electricity in Gorakhpur district. Gorakhpur is one of the 21 districts PuVVNL lists as its area.
Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce
Modelled solar outputabout 1,360 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 620 km from Gorakhpur in a straight line

Solar services in Gorakhpur

Gorakhpur: industrial areas and district products

The MSME Development Institute's industrial profile of Gorakhpur district (2016) lists industrial areas including GIDA (the Gorakhpur Industrial Development Authority area), Nathmalpur and the UPSIDC industrial area at Gorakhpur.

Under the state's One District One Product scheme, the products listed for Gorakhpur district are Terracotta and Readymade Garments.

The Government of India's One District One Product (ODOP) list names Terracotta and Readymade Garments as the products of Gorakhpur district.

Solar output in Gorakhpur

A solar plant in Gorakhpur is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.10 per kVAh
100 kW1.4 lakh units1,000 sq m₹9.7 lakh
500 kW6.8 lakh units5,000 sq m₹48.3 lakh
1 MW13.6 lakh units10,000 sq m₹96.6 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Gorakhpur

For a rooftop array in Gorakhpur the strongest month is April, at about 143 units for each kW installed, and the weakest is July, at about 88. For a ground-mounted array at a 31° tilt the strongest month is March (about 149) and the weakest is July (about 79). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January110136
February114132
March141149
April143139
May141128
June11299
July8879
August9287
September9495
October113126
November108132
December106135

Somaya Solar projects near Gorakhpur

These are the Somaya Solar projects closest to Gorakhpur, with straight-line distances. They are shown as references and are not in Gorakhpur unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 360 km from Gorakhpur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 440 km from Gorakhpur. Completed, including the transmission line work coordinated with the local distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 510 km from Gorakhpur. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Gorakhpur

Which electricity company handles solar connections in Gorakhpur?

Purvanchal Vidyut Vitran Nigam Limited (PuVVNL), the state distribution company with its head office in Varanasi, supplies electricity in Gorakhpur district. Gorakhpur is one of the 21 districts PuVVNL lists as its area.

Is net metering available for factories and commercial buildings in Gorakhpur?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much electricity does a solar plant generate in Gorakhpur?

About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Gorakhpur?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 620 km from Gorakhpur in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 360 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Gorakhpur

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.