Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Khalilabad, Uttar Pradesh.

Khalilabad at a glance for solar projects

District and stateSant Kabir Nagar district, Uttar Pradesh
Electricity supplyPurvanchal Vidyut Vitran Nigam Limited (PuVVNL) supplies electricity in Sant Kabir Nagar district, one of the districts it lists as its area.
Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce
Modelled solar outputabout 1,370 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 590 km from Khalilabad in a straight line

Solar services in Khalilabad

Local points for solar projects in Khalilabad

The Government of India's One District One Product (ODOP) list names Brass Utensils and Hosiery Products as the products of Sant Kabir Nagar district.

Solar output in Khalilabad

A solar plant in Khalilabad is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.10 per kVAh
100 kW1.4 lakh units1,000 sq m₹9.7 lakh
500 kW6.8 lakh units5,000 sq m₹48.6 lakh
1 MW13.7 lakh units10,000 sq m₹97.3 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Khalilabad

For a rooftop array in Khalilabad the strongest month is April, at about 143 units for each kW installed, and the weakest is July, at about 88. For a ground-mounted array at a 31° tilt the strongest month is March (about 150) and the weakest is July (about 80). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January110137
February114133
March141150
April143139
May143129
June113100
July8880
August9287
September9596
October114127
November109133
December106136

Somaya Solar projects near Khalilabad

These are the Somaya Solar projects closest to Khalilabad, with straight-line distances. They are shown as references and are not in Khalilabad unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 340 km from Khalilabad. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 420 km from Khalilabad. Completed, including the transmission line work coordinated with the local distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 490 km from Khalilabad. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Khalilabad

Which electricity company handles solar connections in Khalilabad?

Purvanchal Vidyut Vitran Nigam Limited (PuVVNL) supplies electricity in Sant Kabir Nagar district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Khalilabad?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much electricity does a solar plant generate in Khalilabad?

About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Khalilabad?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 590 km from Khalilabad in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 340 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Khalilabad

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image