Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Ajmer, Rajasthan. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Ajmer: industrial areas
RIICO, the Rajasthan State Industrial Development and Investment Corporation, lists Palra, Makhupura and Parbatpura among the industrial areas of its Ajmer unit office. The same office also covers areas at Beawar and Kekri.
The Government of India's One District One Product (ODOP) list names Granite and Marble Products as the product of Ajmer district.
Metering rules for business rooftops in Ajmer
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
The size limits, charges and other conditions for Rajasthan are on the page Commercial & Industrial Solar in Rajasthan.
Ajmer's supply is run by TPADL, so that is the company to ask first about connecting a rooftop plant in the city. The licence stays with AVVNL. Ask for the current steps before you apply, because the process for a commercial or industrial connection can change.
Output and bill value for a rooftop plant in Ajmer
A solar plant in Ajmer is modelled to produce about 1,460 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.50 per unit |
|---|---|---|---|
| 100 kW | 1.5 lakh units | 1,000 sq m | ₹9.5 lakh |
| 250 kW | 3.6 lakh units | 2,500 sq m | ₹23.7 lakh |
| 500 kW | 7.3 lakh units | 5,000 sq m | ₹47.5 lakh |
| 1 MW | 14.6 lakh units | 10,000 sq m | ₹94.9 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Ajmer
These are the Somaya Solar projects closest to Ajmer, with straight-line distances. They are shown as references and are not in Ajmer unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 510 km from Ajmer. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 520 km from Ajmer. Included net-metering coordination with the local electricity distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 520 km from Ajmer. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Ajmer
Which electricity company handles solar connections in Ajmer?
TP Ajmer Distribution Limited (TPADL) has run electricity distribution in Ajmer city since 1 July 2017 as the distribution franchisee of Ajmer Vidyut Vitran Nigam Limited (AVVNL), which holds the licence.
Is net metering available for factories and commercial buildings in Ajmer?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.
How much electricity does a solar plant generate in Ajmer?
About 1,460 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Ajmer?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 370 km from Ajmer in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 510 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Ajmer
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- RERC rooftop (grid-interactive distributed renewable energy) regulations, 2021, with amendments to December 2025, and RERC order of 7 February 2024
- RERC tariff order for 2026-27, dated 30 March 2026
- RIICO: layout plans of industrial areas, listed by unit office (updated 3 September 2026)
- TP Ajmer Distribution Limited: Annual Report 2025-26, page 15