Somaya Solar Solutions Limited is an EPC contractor for PM-KUSUM solar plants. This page sets out how the scheme works for land and pumps in Along, Arunachal Pradesh and what we do on such a project.
What PM-KUSUM covers
PM-KUSUM is a central government scheme of the Ministry of New and Renewable Energy, run in each state by state implementing agencies. Capacity is allotted to states on demand. The Ministry told the Lok Sabha on 29 July 2026 that the scheme's timeline is extended to 31 March 2027 for all components. The three parts of the scheme are set out on our PM-KUSUM page.
Who runs PM-KUSUM in Arunachal Pradesh
The Lok Sabha answer reports solar pumps under PM-KUSUM Component B in Arunachal Pradesh, and nothing under Component A or Component C.
The targets, tariffs and application details for Arunachal Pradesh are on the page PM-KUSUM in Arunachal Pradesh.
For land or pumps in Along, the electricity supplier is the one to check first: Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies West Siang district.
What a PM-KUSUM plant produces in Along
A solar plant in Along is modelled to produce about 1,120 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (33°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 500 kW | 5.6 lakh units | 2 to 2.5 acres |
| 1 MW | 11.2 lakh units | 4 to 5 acres |
| 2 MW | 22.4 lakh units | 8 to 10 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What Somaya Solar does on a PM-KUSUM plant
Somaya Solar works as the EPC contractor for the farmer, developer or group that holds the allocation. It does not allot capacity or decide subsidy.
- Site check of the land and its distance from the substation
- Plant design and equipment supply
- Installation, testing and commissioning
- The line to the substation and coordination with the electricity supplier
- Support with the documents the implementing agency asks for
More detail: PM-KUSUM across India.
PM-KUSUM plants built by Somaya Solar
These are the Somaya Solar projects closest to Along, with straight-line distances. They are shown as references and are not in Along unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1520 km from Along. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1600 km from Along. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Along
Which electricity company handles solar connections in Along?
Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies West Siang district.
How much electricity does a solar plant generate in Along?
About 1,120 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.2 lakh units a year. A site study gives the figure to plan on.
Who do I apply to for PM-KUSUM in Arunachal Pradesh?
The Lok Sabha answer reports solar pumps under PM-KUSUM Component B in Arunachal Pradesh, and nothing under Component A or Component C.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Along?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1700 km from Along in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1520 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Along
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.