Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Arunachal Pradesh.
Arunachal Pradesh at a glance for solar projects
| Electricity regulator | Arunachal Pradesh State Electricity Regulatory Commission (APSERC) |
|---|---|
| State renewable energy agency | Arunachal Pradesh Energy Development Agency (APEDA) |
| Electricity distribution | APDOP (The whole state of Arunachal Pradesh, including Itanagar) |
| Rooftop metering for businesses | Net metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW |
Solar services in Arunachal Pradesh
- Solar EPC Company in Arunachal Pradesh
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Arunachal Pradesh
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Arunachal Pradesh
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Arunachal Pradesh
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Arunachal Pradesh
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Arunachal Pradesh
One contract from survey to a working plant, with approvals and handover included.
Solar output by place in Arunachal Pradesh
Solar output changes across Arunachal Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 940 to 1,120 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Along | 1,050 | 1,120 |
| Basar | 1,070 | 1,140 |
| Hawai | 1,110 | 1,170 |
| Itanagar | 1,120 | 1,190 |
| Lemmi | 1,110 | 1,170 |
| Naharlagun | 1,120 | 1,190 |
| Namsai | 1,110 | 1,180 |
| Pangin | 1,010 | 1,070 |
| Pasighat | 1,080 | 1,150 |
| Raga | 990 | 1,050 |
| Tato | 940 | 980 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Places we cover in Arunachal Pradesh
Questions about solar projects in Arunachal Pradesh
Is net metering available for factories and commercial buildings in Arunachal Pradesh?
In Arunachal Pradesh, grid-connected distributed renewable systems fall under the APERC (Grid Interactive Distributed Renewable Energy System with Net Metering including Group Net Metering and Virtual Net Metering, Net Billing/Net Feed-In, Gross Metering and Its Related Matters) Regulations, 2024, notified on 4 March 2024 and published in the Gazette on 11 March 2024. They replaced the 2016 rooftop regulations.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Arunachal Pradesh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APERC (Grid Interactive Distributed Renewable Energy System with Net Metering, Group and Virtual Net Metering, Net Billing/Net Feed-In, Gross Metering and Its Related Matters) Regulations, 2024 (Arunachal Pradesh Gazette, 11 March 2024)
- APSERC order on Petition TP-10 of 2025, issued 31 March 2026 (paragraph 1.4)
- APSERC order on Petition TP-10 of 2025, issued 31 March 2026, which describes APEDA as responsible for non-conventional energy in the state
- Arunachal Pradesh State Electricity Regulatory Commission (APSERC), Itanagar
- PVGIS, European Commission Joint Research Centre (solar output model)