Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Tato, Arunachal Pradesh.

Tato at a glance for solar projects

District and stateShi Yomi district, Arunachal Pradesh
Electricity supplyDepartment of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies Shi Yomi district.
Electricity regulatorArunachal Pradesh State Electricity Regulatory Commission (APSERC)
State renewable energy agencyArunachal Pradesh Energy Development Agency (APEDA)
Rooftop metering for businessesNet metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW
Modelled solar outputabout 940 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1650 km from Tato in a straight line

Solar services in Tato

Local points for solar projects in Tato

The Government of India's One District One Product (ODOP) list names Kiwi as the product of Shi Yomi district.

Solar output in Tato

A solar plant in Tato is modelled to produce about 940 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial, HT, three-phase 11 kV energy charge of ₹4.50 per kWh (APSERC order on Petition TP-10 of 2025, issued 31 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹4.15 per kWh at 33 kV and ₹4.00 at 132 kV, and ₹4.95 on LT. The schedule shows an energy rate only and says a consumer does not pay a minimum charge. Time-of-day billing starts for consumers with maximum demand above 10 kW after smart meters are installed: solar hours from 8 AM to 4 PM at 20% below the normal energy rate and 5 PM to 9 PM at 1.2 times the normal rate. The Commission records that every consumer category is subsidised by the state government. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.50 per kWh
100 kW0.9 lakh units1,000 sq m₹4.2 lakh
500 kW4.7 lakh units5,000 sq m₹21.1 lakh
1 MW9.4 lakh units10,000 sq m₹42.3 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Tato

For a rooftop array in Tato the strongest month is March, at about 87 units for each kW installed, and the weakest is June, at about 65. For a ground-mounted array at a 31° tilt the strongest month is November (about 97) and the weakest is June (about 59). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January8095
February7787
March8791
April8785
May8579
June6559
July6661
August8076
September7273
October8087
November8297
December7794

Somaya Solar projects near Tato

These are the Somaya Solar projects closest to Tato, with straight-line distances. They are shown as references and are not in Tato unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1420 km from Tato. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1490 km from Tato. Completed, including the transmission line work coordinated with the local distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1500 km from Tato. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Tato

Which electricity company handles solar connections in Tato?

Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies Shi Yomi district.

Is net metering available for factories and commercial buildings in Tato?

Net metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW. The rule is the same across Arunachal Pradesh.

How much electricity does a solar plant generate in Tato?

About 940 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 9.4 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Tato?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1650 km from Tato in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1420 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Tato

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.