Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Pangin, Arunachal Pradesh.

Pangin at a glance for solar projects

District and stateSiang district, Arunachal Pradesh
Electricity supplyDepartment of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies Siang district.
Electricity regulatorArunachal Pradesh State Electricity Regulatory Commission (APSERC)
State renewable energy agencyArunachal Pradesh Energy Development Agency (APEDA)
Rooftop metering for businessesNet metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW
Modelled solar outputabout 1,010 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1710 km from Pangin in a straight line

Solar services in Pangin

Local points for solar projects in Pangin

The Government of India's One District One Product (ODOP) list names Ginger as the product of Siang district.

Solar output in Pangin

A solar plant in Pangin is modelled to produce about 1,010 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial, HT, three-phase 11 kV energy charge of ₹4.50 per kWh (APSERC order on Petition TP-10 of 2025, issued 31 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹4.15 per kWh at 33 kV and ₹4.00 at 132 kV, and ₹4.95 on LT. The schedule shows an energy rate only and says a consumer does not pay a minimum charge. Time-of-day billing starts for consumers with maximum demand above 10 kW after smart meters are installed: solar hours from 8 AM to 4 PM at 20% below the normal energy rate and 5 PM to 9 PM at 1.2 times the normal rate. The Commission records that every consumer category is subsidised by the state government. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.50 per kWh
100 kW1.0 lakh units1,000 sq m₹4.5 lakh
500 kW5.0 lakh units5,000 sq m₹22.7 lakh
1 MW10.1 lakh units10,000 sq m₹45.5 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Pangin

For a rooftop array in Pangin the strongest month is May, at about 94 units for each kW installed, and the weakest is July, at about 74. For a ground-mounted array at a 32° tilt the strongest month is October (about 104) and the weakest is July (about 67). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January82102
February7789
March9398
April8986
May9487
June7668
July7467
August8480
September8385
October92104
November82101
December79100

Somaya Solar projects near Pangin

These are the Somaya Solar projects closest to Pangin, with straight-line distances. They are shown as references and are not in Pangin unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1480 km from Pangin. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1540 km from Pangin. Completed, including the transmission line work coordinated with the local distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1570 km from Pangin. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Pangin

Which electricity company handles solar connections in Pangin?

Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies Siang district.

Is net metering available for factories and commercial buildings in Pangin?

Net metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW. The rule is the same across Arunachal Pradesh.

How much electricity does a solar plant generate in Pangin?

About 1,010 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 10.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Pangin?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1710 km from Pangin in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1480 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Pangin

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image