Somaya Solar Solutions Limited builds ground-mounted solar power plants in Arunachal Pradesh for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Arunachal Pradesh
Solar output changes across Arunachal Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 980 to 1,190 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Along | 1,050 | 1,120 |
| Basar | 1,070 | 1,140 |
| Hawai | 1,110 | 1,170 |
| Itanagar | 1,120 | 1,190 |
| Lemmi | 1,110 | 1,170 |
| Naharlagun | 1,120 | 1,190 |
| Namsai | 1,110 | 1,180 |
| Pangin | 1,010 | 1,070 |
| Pasighat | 1,080 | 1,150 |
| Raga | 990 | 1,050 |
| Tato | 940 | 980 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Arunachal Pradesh
Under APSERC's Green Energy Open Access Regulations, 2024, a consumer with a contracted demand (HT) or sanctioned load (LT) of 100 kW or more, other than a captive user, can take green power through open access. A captive consumer has no minimum load. The tariff order for 2026-27 sets the wheeling charge.
- Banked energy carries a banking charge of 8% of the energy banked, adjusted in kind.
- The cross-subsidy surcharge for green energy open access may not exceed 20% of the tariff or average billing rate of the consumer category.
- Wheeling charge for 2026-27: ₹1.93 per unit, worked out from the wire business cost of ₹304.66 crore over 1,576.38 MU.
- The Commission's tariff order says that in practice there is no cross-subsidy among consumer categories in the state, because the differences in tariff come from state government subsidy. The order gives no cross-subsidy surcharge or additional surcharge figure.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Arunachal Pradesh
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Arunachal Pradesh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.