Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Lemmi, Arunachal Pradesh.
Lemmi at a glance for solar projects
| District and state | Pakke Kessang district, Arunachal Pradesh |
|---|---|
| Electricity supply | Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies Pakke Kessang district. |
| Electricity regulator | Arunachal Pradesh State Electricity Regulatory Commission (APSERC) |
| State renewable energy agency | Arunachal Pradesh Energy Development Agency (APEDA) |
| Rooftop metering for businesses | Net metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW |
| Modelled solar output | about 1,110 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1560 km from Lemmi in a straight line |
Solar services in Lemmi
- Solar EPC Company in Lemmi
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Lemmi
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Lemmi
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Lemmi
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Lemmi
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Lemmi
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Lemmi
The Government of India's One District One Product (ODOP) list names Jua and Lahi Rice as the product of Pakke Kessang district.
Solar output in Lemmi
A solar plant in Lemmi is modelled to produce about 1,110 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial, HT, three-phase 11 kV energy charge of ₹4.50 per kWh (APSERC order on Petition TP-10 of 2025, issued 31 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹4.15 per kWh at 33 kV and ₹4.00 at 132 kV, and ₹4.95 on LT. The schedule shows an energy rate only and says a consumer does not pay a minimum charge. Time-of-day billing starts for consumers with maximum demand above 10 kW after smart meters are installed: solar hours from 8 AM to 4 PM at 20% below the normal energy rate and 5 PM to 9 PM at 1.2 times the normal rate. The Commission records that every consumer category is subsidised by the state government. The schedule applies throughout the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹4.50 per kWh |
|---|---|---|---|
| 100 kW | 1.1 lakh units | 1,000 sq m | ₹5.0 lakh |
| 500 kW | 5.5 lakh units | 5,000 sq m | ₹25.0 lakh |
| 1 MW | 11.1 lakh units | 10,000 sq m | ₹50.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Lemmi
For a rooftop array in Lemmi the strongest month is March, at about 109 units for each kW installed, and the weakest is June, at about 79. For a ground-mounted array at a 31° tilt the strongest month is January (about 115) and the weakest is June (about 71). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 95 | 115 |
| February | 91 | 104 |
| March | 109 | 115 |
| April | 99 | 96 |
| May | 98 | 90 |
| June | 79 | 71 |
| July | 80 | 73 |
| August | 84 | 80 |
| September | 87 | 88 |
| October | 101 | 112 |
| November | 94 | 112 |
| December | 90 | 113 |
Somaya Solar projects near Lemmi
These are the Somaya Solar projects closest to Lemmi, with straight-line distances. They are shown as references and are not in Lemmi unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1320 km from Lemmi. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1340 km from Lemmi. Completed, including the transmission line work coordinated with the local distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1420 km from Lemmi. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Lemmi
Which electricity company handles solar connections in Lemmi?
Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies Pakke Kessang district.
Is net metering available for factories and commercial buildings in Lemmi?
Net metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW. The rule is the same across Arunachal Pradesh.
How much electricity does a solar plant generate in Lemmi?
About 1,110 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.1 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Lemmi?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1560 km from Lemmi in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1320 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Lemmi
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APERC (Grid Interactive Distributed Renewable Energy System with Net Metering, Group and Virtual Net Metering, Net Billing/Net Feed-In, Gross Metering and Its Related Matters) Regulations, 2024 (Arunachal Pradesh Gazette, 11 March 2024)
- APSERC order on Petition TP-10 of 2025 (31 March 2026), para 1.4
- APSERC order on Petition TP-10 of 2025, issued 31 March 2026 (Table 82 and tariff schedule, Category 5 Industrial; paragraph 6.5 for time-of-day)
- APSERC order on Petition TP-10 of 2025, issued 31 March 2026, which describes APEDA as responsible for non-conventional energy in the state
- Arunachal Pradesh State Electricity Regulatory Commission (APSERC), Itanagar
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)